Phosphate Mining Tanzania: Deposits, Licences, the 1% Fertiliser Royalty, TFRA and Zanzibar

What does it take to mine phosphate in Tanzania? Phosphate is an industrial mineral under the Mining Act, Cap. 123. On the Mainland a miner needs a Primary Mining Licence (citizens only), a mining licence or a special mining licence from the Mining Commission, usually after a prospecting licence. Royalty is 1% where the phosphate is used for fertiliser and 3% otherwise, plus a 1% inspection fee.
Phosphate mining Tanzania rules start from one fact: the Mining Act names phosphate first in its list of industrial minerals. That puts phosphate rock in the same licensing family as limestone, gypsum and kaolin. It also gives phosphate a second regulator once it becomes a fertiliser, because the Tanzania Fertilizer Regulatory Authority (TFRA) registers fertiliser products and licenses dealers. This guide covers where the deposits are, the licences and their fees, royalty and levies, environmental charges, the fertiliser side, and the position in Zanzibar. A worked example uses register figures and production values reported in 2026.
Our guides to limestone mining in Tanzania and gypsum mining in Tanzania follow the same structure for those minerals.
What the law says
Three instruments govern a phosphate project on the Mainland, and a fourth applies once the product is sold as fertiliser.
- Mining Act, Cap. 123. Section 2 of the TanzLII text as at 30 November 2019 says the Act "shall apply to Tanzania Mainland". Section 4 defines "industrial minerals" as a group "comprising of phosphate, kaolin, lime, gypsum, dolomite" and other non-metallic minerals normally used in industry. The current text is the Revised Edition 2023, published by the Mining Commission.
- Mining (Mineral Rights) Regulations 2018, GN 1 of 2018. Its First Schedule sets application, preparation and renewal fees and annual rent for each licence type. A summary is on the UNEP LEAP legislation database.
- Environmental Management Act, Cap. 191, and its fee regulations. The Environmental Management (Fees and Charges) Regulations 2021, GN 387 of 2021 set NEMC's EIA review fees and annual compliance fees.
- Fertilizers Act, 2009 (Cap. 378). The Act as enacted established TFRA. It requires fertilisers to be registered and fertiliser businesses to be licensed. The Fertilizers Regulations 2026, GN 68 of 2026, carry the current fees.
The Mining Act also defines "mineral concentrate" to include "agro-minerals for fertilizers such as phosphate". That matters for the value addition and export rules covered later.
Who should read this
- Tanzanian citizens and citizen-owned companies applying for a Primary Mining Licence over a phosphate showing.
- Local and foreign investors weighing a prospecting licence, mining licence or special mining licence for a phosphate deposit.
- Fertiliser manufacturers and blenders who buy phosphate rock, or who want to mine their own feedstock.
- Traders who buy phosphate from licence holders for domestic sale or export.
- Lenders and buyers checking a phosphate project's licences and payments before they commit funds.
Where are the phosphate deposits in Tanzania?
The best-known deposit is Minjingu, in Babati District of Manyara Region, which was part of Arusha Region before Manyara was created. The Geological Survey of Tanzania brochure lists carbonatites in the rift systems that "host a range of mineral deposits namely phosphate at Mbalizi and Minjingu". It also lists rock phosphate among the coastal sedimentary minerals.
| Area | Region | What the sources report |
|---|---|---|
| Minjingu | Manyara (Babati District) | Phosphate mine listed by USGS with a capacity of 100,000 tonnes a year; not operating at the end of 2019 |
| Vilima Vitatu | Manyara (Babati District) | Phosphate mine producing since 2023, selling locally and to Burundi (Daily News, February 2026) |
| Mbalizi | Mbeya | Carbonatite-hosted phosphate (GST) |
| Ngualla | About 150 km north-west of Mbeya | Rare earth, niobium, tantalum and phosphate deposit; rare earths are the main target (GST) |
| Coastal basins | Coastal belt | Rock phosphate among sedimentary occurrences, no sites named (GST) |
The USGS 2019 Minerals Yearbook for Tanzania, published in September 2023, records phosphate rock output of 23,658 tonnes in 2016 and 15,896 tonnes in 2017, then none in 2018 and 2019. Production has since restarted in Manyara. A deposit named in a survey is not a mineral right. Check the Mining Commission cadastre before assuming any area is open.
Is phosphate an industrial mineral under the Mining Act?
Yes. The section 4 definition of "industrial minerals" lists phosphate first, ahead of kaolin, lime, gypsum and dolomite. Four consequences follow:
- Royalty. The general rate for the industrial minerals group is 3% of gross value. Phosphate used for fertiliser has its own 1% rate (register F0624).
- Annual rent. Mining licence rent for building and industrial minerals is USD 2,000 per km2, lower than the USD 3,000 for metallic minerals and gemstones (register F0621).
- Prospecting spend. The minimum annual expenditure on a prospecting licence for industrial minerals is USD 100 per km2, against USD 500 for most minerals (register F0618).
- Dealer licence class. A mineral dealer in coal and industrial minerals pays USD 500 for the licence (register F0622).
Phosphate also counts as an agro-mineral in the "mineral concentrate" definition. Treat processed phosphate as a concentrate for export and value addition purposes until the Commission says otherwise.
Which licence do you need to mine phosphate?
The choice turns on the citizenship of the applicant and the scale of the operation. Our Primary Mining Licence guide and mining licence guide cover each route in detail.
| Licence | Who may hold it | Typical phosphate use |
|---|---|---|
| Prospecting licence (PL) | Citizens and foreign-owned companies | Drilling, sampling and resource work before mining |
| Primary Mining Licence (PML) | Tanzanian citizens and citizen-controlled entities only | Small open pits supplying blenders or local fertiliser plants |
| Mining licence (ML) | Citizens and foreign-owned companies | Medium mines with a processing plant |
| Special mining licence (SML) | Citizens and foreign-owned companies | Large integrated mine and fertiliser complex |
Section 8(2) of the 2019 text bars a PML for "any minerals" unless the holder is a citizen, or a partnership or company controlled by citizens. A foreign investor therefore enters through a PL, ML or SML. The capital bands that separate an ML from an SML are set by the Commission; confirm them before choosing a route.
Processing phosphate rock into fertiliser at a separate plant may also need a processing licence under the Mining (Mineral Beneficiation) Regulations 2018. Our mineral processing licence guide explains that route.
What are the licence fees and annual rent?
These are the Mining Commission lines in the Zatra fee register, stated at 26 September 2026. USD amounts are paid at the TZS equivalent shown on the control number.
| Licence | Application and preparation | Annual rent | Register ID |
|---|---|---|---|
| Prospecting licence | Preparation USD 300 (all minerals); application fee for industrial minerals: confirm with the Mining Commission | USD 100 per km2 initial period; USD 150 first renewal; USD 200 second renewal | F0615, F0616 |
| PL renewal | USD 300 | As above | F0617 |
| Primary Mining Licence | Application TZS 50,000; preparation TZS 50,000; renewal TZS 100,000; transfer TZS 500,000 | TZS 45,000 per hectare (minimum TZS 90,000 under 2 ha) | F0619, F0620 |
| Mining licence | Application USD 2,000; preparation USD 1,000; renewal application USD 2,000 | USD 2,000 per km2 (building and industrial minerals) | F0621 |
| Special mining licence | Application USD 5,000; preparation USD 2,000; renewal application USD 5,000 | USD 5,000 per km2 | F0621 |
The PML rent of TZS 45,000 per hectare is the "other minerals" rate. Phosphate is not gold, a gemstone or salt, so the higher and lower rows in F0620 do not apply. Other administrative charges sit in register line NEW-06-16: a transfer of a mineral right other than a PML costs USD 3,000, and registration of a document USD 500. Rent is due each year in advance; our mining annual rent guide sets out the dates and the default rules.
What royalty applies to phosphate in Tanzania?
Royalty is charged on the gross value of the minerals. The register records these rates under section 111(1) of Cap. 123 R.E. 2023, formerly section 87 (register F0624):
- 1% for phosphate or limestone used for fertiliser, coal used as an industrial raw material, cut and polished gems, and salt.
- 3% for other minerals, including building materials and the industrial minerals group.
The 2019 TanzLII text shows the earlier position. Section 87(1)(e) charged "all minerals within the industrial minerals group" at three per centum, with no fertiliser rate. The register attributes the change to the Finance Act No. 6 of 2024. We could not open the amending text or the Mining Commission royalty page this session, so the section reference stays on the Figures to confirm list.
Reported payments match the split. The Daily News report of 26 February 2026 on the Vilima Vitatu mine gives these figures:
- Domestic sales of 22,686 tonnes, valued at TZS 9.07 billion, paid TZS 90.74 million in royalty. That is 1.0%.
- Exports to Burundi of 47,243 tonnes, valued at TZS 27.92 billion, paid TZS 837.64 million. That is 3.0%.
In practice, the 1% rate attaches to phosphate shown to be going to fertiliser use, and the Commission charged 3% on the exports in that report. Agree the evidence of end use with the Commission's regional office before the first sale.
What other charges fall on a phosphate sale?
Royalty is not the only charge on gross value. Each sale also attracts the following:
| Charge | Rate | Collector | Register ID |
|---|---|---|---|
| Inspection fee | 1% of gross value, before clearance for export or domestic use | Mining Commission | F0625 |
| HIV Response Levy | 0.1% of gross value, paid with royalty | Mining Commission | F0626 |
| Withholding tax on purchases from PML holders | 2%, final | Buyer, remitted to TRA | F0629 |
| Service levy | 0.25% of turnover | District council | F0630 |
| Mineral export permit | USD 100 per application | Mining Commission | F0628 |
The inspection fee sits in section 115(3) to (5) of R.E. 2023, formerly section 90A. The 2019 text called it a "clearance fee". The HIV Response Levy was added as section 113A by the Finance Act 2025, as Clyde & Co noted on 21 August 2025. Income tax, VAT and other taxes are covered in our mining tax guide and our royalty and inspection fee guide.
Worked example: a PML selling phosphate to a fertiliser plant
A citizen-owned company holds an 8-hectare PML over a phosphate showing in Manyara. In one year it sells 2,000 tonnes to a fertiliser plant in Tanzania. We use TZS 400,000 a tonne, close to the average domestic value in the Daily News report (TZS 9.07 billion over 22,686 tonnes). The price is an assumption; the Commission values minerals on its own data.
| Line | Basis | TZS |
|---|---|---|
| Gross value | 2,000 t at TZS 400,000 | 800,000,000 |
| Royalty, fertiliser use | 1% (F0624) | 8,000,000 |
| Inspection fee | 1% (F0625) | 8,000,000 |
| HIV Response Levy | 0.1% (F0626) | 800,000 |
| Service levy | 0.25% of turnover (F0630) | 2,000,000 |
| PML annual rent | 8 ha at TZS 45,000 (F0620) | 360,000 |
| Total government charges | Excluding withholding tax | 19,160,000 |
| Withholding tax deducted by the buyer | 2% final (F0629) | 16,000,000 |
Charges on value come to about 2.4% of sales, before the 2% final withholding tax. If the same 2,000 tonnes were exported, royalty would rise to 3%, or TZS 24,000,000. Total charges would then be TZS 35,160,000 before withholding, plus a USD 100 export permit fee (F0628). In the first year, add the PML application and preparation fees of TZS 100,000 (F0619) and the environmental costs set out below.
For a foreign-owned company with a 2 km2 mining licence, the fixed costs change. Application and preparation total USD 3,000, and rent is USD 4,000 a year at USD 2,000 per km2 (F0621). The royalty and inspection fee rates stay the same.
What environmental approvals and NEMC fees apply?
A mining licence or special mining licence application needs an environmental certificate issued under Cap. 191. NEMC charges these lines (register IDs as shown):
- EIA application and scoping. TZS 50,000 to apply and TZS 150,000 to submit a project brief or scoping report (F0495).
- EIA review, Type A extractive projects. TZS 5,000,000 where project cost is below TZS 1 billion, rising to TZS 100,000,000 at TZS 500 billion and above (F0498).
- Annual fee, major mining works. TZS 4,500,000 a year (F0505).
- Annual fee, fertiliser production. TZS 1,500,000 a year for a fertiliser plant (NEW-05-06).
- Due date. Annual compliance fees fall due on 1 July. Payment after 31 December attracts a penalty of 5% a month (NEW-05-01).
NEMC also charges per-tonne environmental fees on industrial minerals produced, such as TZS 5,000 a tonne for limestone and TZS 2,000 for gypsum (NEW-05-04). The register line does not name phosphate. Confirm the phosphate rate with NEMC before pricing a contract. Whether a small PML needs a full EIA or a lighter environmental plan is also a question for NEMC and the Commission. Our guide to mining obligations after the EIA certificate covers what follows approval.
Does the Government take a free carried interest in a phosphate mine?
Yes, for a mining licence or special mining licence. Section 10(1) of the 2019 text gives the Government "not less than sixteen percent non-dilutable free carried interest shares" in those licences. The share depends on the type of mineral and the level of investment. The register records the same 16% floor against F0621. The section number may have moved in R.E. 2023, so confirm it before citing it in a contract.
A PML is not caught by that provision, since its holder is already citizen-controlled. Our free carried interest guide explains how the shares are issued and what the State's stake means for dividends and board seats.
What local content rules apply?
Every mineral right holder, contractor and subcontractor falls under the Mining (Local Content) Regulations 2018, listed in the FAO FAOLEX database. In practice this means four things:
- A local content plan, approved by the Commission, covering employment, training and procurement.
- Priority to Tanzanian goods and services, with some services reserved for Tanzanian-owned companies.
- Banking, insurance and legal services sourced through Tanzanian providers, subject to the Regulations' exceptions.
- Regular reports to the Commission on actual local spend.
Our mining local content guide covers the ownership tests suppliers must meet.
How does fertiliser regulation affect a phosphate miner?
Selling phosphate rock to a fertiliser plant does not make the miner a fertiliser dealer. Selling ground rock phosphate to farmers as a fertiliser does. At that point TFRA becomes the second regulator.
| Step | TFRA requirement | Government fee | Register ID |
|---|---|---|---|
| Product registration | Apply on TFRA's FIS system with a certificate of analysis, safety data and label | Laboratory analysis USD 20 to USD 70 per parameter | F0766 |
| Field test, where TFRA requires one | Trial per new fertiliser or supplement | USD 10,000 per cropping season | F0767 |
| Dealer licence and premises registration | Licence under the Act and GN 68 of 2026 | No fee set in GN 68 of 2026 | F0768 |
| Fertiliser export permit | Permit for fertiliser exports | USD 0.5 a tonne | F0765 |
The TFRA registration page describes the steps: application on FIS, attached documents, laboratory analysis, a field trial if required, review and a registration certificate. Our guides to registering a fertiliser product, the fertiliser dealer licence and the Fertilizer Regulations 2026 cover each step.
TFRA published a notice dated 23 October 2026 inviting comments on amendments to the 2026 regulations by 28 October 2026. Check whether amended regulations have been gazetted before relying on the GN 68 fee lines.
Can phosphate be exported from Tanzania?
Yes, with a mineral export permit (F0628) and royalty and inspection fee paid before clearance. The February 2026 report shows 13 permits issued for phosphate exports to Burundi. Two points need checking first:
- Who exports. PML holders usually sell through a licensed mineral dealer, who holds the export permit. A broker may not export (F0623).
- Value addition. The Act treats phosphate for fertiliser as a mineral concentrate. Ask the Commission whether raw phosphate rock can be exported without processing in the country.
Our mineral export permit guide lists the documents for each consignment.
Mainland and Zanzibar: does the Mining Act apply?
No. Section 2 of Cap. 123 limits the Act to Tanzania Mainland, and the Mining Commission licenses only Mainland areas. Zanzibar is a separate jurisdiction for this purpose.
| Item | Mainland | Zanzibar |
|---|---|---|
| Governing law | Mining Act, Cap. 123 | No dedicated mining law reported in November 2024; current status unknown |
| Licensing body | Mining Commission | Confirm with the Revolutionary Government of Zanzibar |
| Phosphate deposits | Manyara, Mbeya and others | None found in our sources |
| Fertiliser regulator | TFRA under Cap. 378 | Confirm whether TFRA rules apply in Zanzibar |
The Citizen reported on 28 November 2024 that "Zanzibar does not have a dedicated mining law" and relied on its 2015 environmental law. A mining bill was then proposed. We could not confirm whether one has since passed. Anyone planning extraction in Zanzibar should get written guidance from the Zanzibar authorities first.
What to do now
- Check the ground. Search the Mining Commission cadastre for existing rights over the area before spending on samples.
- Choose the licence by ownership. Citizens can apply for a PML; foreign or mixed owners need a PL, then an ML or SML.
- Budget the fixed fees. Price application, preparation and first-year rent from register lines F0615 to F0621.
- Start the environmental file early. Register the project with NEMC and budget the EIA review fee for the project's cost band (F0498).
- Document the end use. Keep supply contracts showing the phosphate goes to fertiliser production, so the 1% royalty can be assessed.
- Set up royalty and levy payments. Pay royalty, the 1% inspection fee and the HIV levy against the Commission's control numbers before each dispatch.
- Plan the TFRA route. If the product will reach farmers as fertiliser, register it and license the dealer business first.
- Prepare the local content plan. Agree employment, training and procurement targets with the Commission before operations start.
Key dates
| Event | When | Source |
|---|---|---|
| Mineral right annual rent | Each year, in advance | F0616, F0620, F0621 |
| Royalty, inspection fee and HIV levy | Before clearance of each consignment for domestic use or export | F0624 to F0626 |
| NEMC annual compliance fee | Due 1 July; 5% a month penalty after 31 December | NEW-05-01 |
| Prospecting licence term | Up to 4 years, then two renewals of up to 2 years | F0616 |
| TFRA comments on 2026 regulation amendments | Closed 28 October 2026 | TFRA notice of 23 October 2026 |
How Zatra helps
Our sector permits team prepares mining and TFRA applications and tracks rent, royalty and NEMC deadlines. The foreign investor setup team structures a company for an ML or SML. Our feasibility team models royalty, levies and the Government carried interest for a phosphate project.
Zatra prepares and coordinates the file but does not decide or guarantee any authority's outcome. Government fees are paid at the official rate against the authority's control number, separate from Zatra's professional fee. Route disputes, licence cancellations, seizures, prosecutions and legal opinions to an advocate. All fee lines are in our government fees guide.
Sources and status
Accurate as at 28 November 2026. The Mining Act definitions, application clause, PML rule, carried interest and pre-2024 royalty were read in the 2019 TanzLII text. R.E. 2023 section numbers come from the Zatra fee register, stated at 26 September 2026.
- Mining Act, Cap. 123. TanzLII, text as at 30 November 2019. Accessed 28 Nov 2026.
- The Mining Act, Cap. 123 R.E. 2023. Mining Commission, uploaded June 2025. Accessed 28 Nov 2026.
- Applicable royalty and inspection fee rates. Mining Commission, page current 2026. Accessed 28 Nov 2026.
- Environmental Management (Fees and Charges) Regulations 2021. TanzLII, GN 387 of 14 May 2021. Accessed 28 Nov 2026.
- Fertilizer and fertilizer supplements registration. TFRA, page current 2026. Accessed 28 Nov 2026.
- Solid mineral occurrences and mineral potential of Tanzania. Geological Survey of Tanzania, uploaded November 2024. Accessed 28 Nov 2026.
- The Mineral Industry of Tanzania, 2019. USGS, September 2023. Accessed 28 Nov 2026.
- Phosphate plant in Babati revenue report. Daily News, 26 February 2026. Accessed 28 Nov 2026.
- How Zanzibar hopes to promote economic growth with mining law. The Citizen, 28 November 2024. Accessed 28 Nov 2026.
- Key Mining Act amendments introduced by the Finance Act, 2025. Clyde & Co, 21 August 2025. Accessed 28 Nov 2026.
Figures to confirm before you act
- The amending provision for the 1% fertiliser royalty, recorded in the register as Finance Act No. 6 of 2024 s.59, and the evidence of end use the Commission accepts.
- The prospecting licence application fee for industrial minerals, which F0615 does not print.
- The NEMC per-tonne environmental fee for phosphate, which NEW-05-04 does not name.
- Whether a PML over phosphate needs a full EIA or a lighter environmental plan.
- The R.E. 2023 section numbers for the PML citizenship rule and the free carried interest.
- The ML and SML capital thresholds, and whether raw phosphate rock may be exported unprocessed.
- Zanzibar's mining law and licensing body, and whether TFRA rules reach Zanzibar.
This article is general information based on official sources available at the date of publication. It is not legal, tax or financial advice. Laws and notices change. Verify with the issuing authority or consult Zatra before acting.
Frequently asked questions
Can a foreigner hold a Primary Mining Licence for phosphate?
No. The Mining Act reserves the PML for Tanzanian citizens and for partnerships and companies controlled by citizens. A foreign investor can hold a prospecting licence, mining licence or special mining licence, or can buy phosphate from PML holders through a supply contract.
Does the 1% royalty apply to phosphate sold to a cement or chemical plant?
The register limits the 1% rate to phosphate used for fertiliser. Sales for other industrial uses fall back to the 3% rate for the industrial minerals group. The Commission decides the rate on the evidence of end use, so agree that evidence before the sale.
Who values the phosphate for royalty?
Royalty is charged on gross value, which the Mining Commission assesses. It looks at the sale contract and its own market data. A price well below market can be adjusted upward, so keep invoices, weighbridge tickets and buyer details for every consignment.
Is a mixed-ownership company treated as a citizen for a PML?
Only if citizens control it in the way section 8(2) requires: citizen membership, directors and control. A company with significant foreign shareholding should assume it does not qualify and use a mining licence instead. Confirm the test with the Commission before filing.
Do phosphate fertiliser products need TBS certification as well as TFRA registration?
TFRA is the product regulator for fertilisers under the Fertilizers Act. Whether a Tanzania Bureau of Standards mark is also required depends on the product and any compulsory standard in force. Ask both bodies in writing before launching a branded product.
Can a mineral right over phosphate be used as loan security?
A mineral right can be mortgaged with the Commission's consent, and the mortgage must be registered. Lenders will check rent, royalty and NEMC payments first. Registration of a document carries a USD 500 fee in register line NEW-06-16.
What happens if annual rent on a phosphate licence is not paid?
Unpaid rent is a ground for the Commission to issue a default notice and, if it is not remedied, to cancel the licence. Cancellation disputes should go to an advocate promptly, because time limits for responses are short.
Do phosphate processing plants pay NEMC fees separately from the mine?
Yes, where the plant is a separate undertaking. A fertiliser production plant carries its own annual compliance fee of TZS 1,500,000 (NEW-05-06), in addition to the mine's fees. Each site with its own environmental certificate is billed on its own.
Sources & regulators
Verify before filing: Rates, forms and thresholds move by Finance Act, Government Notice and portal revision. Confirm the live schedule on the mandate-holder portal before you budget or submit. Law-firm alerts and Big Four notes are discovery only.
- Mining Act, Cap. 123: TanzLII, text as at 30 November 2019; ss.2, 4, 8(2), 10(1), 87(1) and 90A read. Accessed 2026-11-28.
- The Mining Act, Cap. 123 R.E. 2023: Mining Commission, Revised Edition 2023, uploaded June 2025. Accessed 2026-11-28.
- Applicable royalty and inspection fee rates: Mining Commission, page current 2026 (not reachable on 28 Nov 2026). Accessed 2026-11-28.
- Environmental Management (Fees and Charges) Regulations 2021, GN 387 of 2021: TanzLII, published 14 May 2021. Accessed 2026-11-28.
- Fertilizer and fertilizer supplements registration: Tanzania Fertilizer Regulatory Authority, page current 2026. Accessed 2026-11-28.
- Public notice: comments on proposed amendments to the 2026 regulations: Tanzania Fertilizer Regulatory Authority, notice dated 23 October 2026. Accessed 2026-11-28.
- A summary of the solid mineral occurrences and mineral potential of Tanzania: Geological Survey of Tanzania, uploaded November 2024. Accessed 2026-11-28.
- The Mineral Industry of Tanzania, 2019 Minerals Yearbook: US Geological Survey, September 2023; phosphate rock output table. Accessed 2026-11-28.
- Phosphate plant in Babati generates TZS 1.29bn in revenue: Daily News, 26 February 2026; royalty and inspection fee figures for domestic and export sales. Accessed 2026-11-28.
- How Zanzibar hopes to promote economic growth with mining law: The Citizen, 28 November 2024. Accessed 2026-11-28.
- Key Mining Act amendments introduced by the Finance Act, 2025: Clyde & Co, 21 August 2025; HIV Response Levy s.113A. Accessed 2026-11-28.
- Fertilizers Act, 2009: Act No. 9 of 2009 as enacted, PolicyVault Africa copy uploaded November 2024. Accessed 2026-11-28.
Disclaimer
This article is informational orientation. It is not legal, tax or investment advice and not a government decision. Tanzanian instruments move by Act, Government Notice, Finance Act and portal revision. If a sentence here disagrees with the live mandate-holder, the mandate-holder wins. Zatra Consultants Limited does not issue licences, permits, tax clearances or approvals, and gives no assurance of any regulatory or banking outcome. Professional fees are published only on /pricing/.
