Mining & Minerals

Mining Annual Rent Tanzania: What Each Licence Pays, When It Falls Due and What Happens If It Is Late

Cover: annual rent on prospecting, primary mining, mining and special mining licences in Mainland Tanzania under the Mining Act Cap. 123 and GN 1 of 2018
Rent per square kilometre or per hectare, billed on the cadastre portal against a GePG control number. As at 20 October 2026.
Direct answer

What is the mining annual rent in Tanzania? Under GN 1 of 2018, as its fee schedule now stands, a prospecting licence pays USD 100 a square kilometre a year for four years, then USD 150 and USD 200 on renewal. A mining licence pays USD 3,000 or USD 2,000 a square kilometre, a special mining licence USD 5,000, and a primary mining licence TZS 90,000 or 45,000 a hectare.

Mining annual rent in Tanzania is the yearly charge a mineral right holder pays to keep its ground. It is separate from royalty, which is paid on minerals sold. This guide covers every Mainland right, the due dates, payment on the cadastre portal, the 90-day penalty, the April 2026 cancellations, Zanzibar and a costed example.

What the law says about mining annual rent

Annual rent on mineral rights rests on one Act and one set of regulations, with a substituted fee schedule.

The rents in force today are the substituted figures, not the ones printed in January 2018. The gazetted text of GN 1 shows a prospecting licence at USD 40 a square kilometre and a mining licence at USD 1,000. Those numbers still circulate in old guides and are wrong. The current figures below come from the Zatra fee register, which records the substituted schedule with its register IDs.

The Revised Edition 2023 of Cap. 123 renumbered many sections. The fee register shows royalty moving from section 87 to section 111. We quote sections 2, 63, 65 and 66 as numbered in the 2019 text we read; confirm the R.E. 2023 numbers before citing them in a filing.

Who should read this

For the licences themselves, read our guides to the prospecting licence, the primary mining licence and the mining licence.

How much annual rent does each mineral right pay?

The table sets out the rent each right pays under the First Schedule as it now stands. The schedule prints a US dollar figure and a shilling figure side by side. The control number the Commission issues sets the currency and amount you pay.

Mineral rightAnnual rentUnitRegister ID
Prospecting licence, initial period (years 1 to 4)USD 100 (TZS 230,000)Per km2F0616
Prospecting licence, first renewal (3 years)USD 150 (TZS 340,000)Per km2F0616
Prospecting licence, second renewal (2 years)USD 200 (TZS 500,000)Per km2F0616
Primary mining licence: gold, kimberlitic diamonds, gemstonesTZS 90,000; minimum TZS 180,000 for an area under 2 haPer hectareF0620
Primary mining licence: other mineralsTZS 45,000; minimum TZS 90,000 for an area under 2 haPer hectareF0620
Mining licence: metallic, energy minerals, gemstones, kimberlitic diamondsUSD 3,000 (TZS 6,800,000)Per km2F0621
Mining licence: building and industrial mineralsUSD 2,000 (TZS 4,500,000)Per km2F0621
Special mining licenceUSD 5,000 (TZS 11,300,000)Per km2F0621
Processing, smelting or refining licenceAnnual fee of half the issue or renewal feePer licenceF0631

One square kilometre is 100 hectares. A primary mining licence is small, so its rent is set per hectare and in shillings only. The other rights are set per square kilometre. Rive & Co, writing on 31 July 2025, gives the same three prospecting licence rates and periods as the register.

Processing, smelting and refining licences sit under the Mining (Mineral Beneficiation) Regulations, 2018, GN 5 of 2018, not GN 1. The register records an application fee of TZS 150,000 (USD 200) and an annual fee equal to half the issue or renewal fee (F0631). Our mineral processing licence guide covers that file.

When does annual rent fall due?

Regulation 11(1) fixes the amount by reference to the First Schedule. In the texts we could read, neither the Act nor GN 1 of 2018 names a calendar date for payment. The working pattern is set by the licence and the Commission's billing:

The exact due date for your licence is on the statement the cadastre portal shows for it. Treat the grant date printed on the licence as the anchor and diarise each anniversary. Our guide to renewing and transferring a mining licence covers the renewal file.

How is annual rent paid on the Mining Commission portal?

The Mining Commission manages mineral rights through the Online Mining Cadastre Transactional Portal. A Clyde & Co briefing of August 2014 on the portal's launch said holders could submit and track payments online. It also said licensing officers run a legal entity history report that lists "overdue payments and overdue reports".

  1. Log in to the holder's account. Use the account under which the licence is registered.
  2. Open the licence and its bill. The portal lists the rent and any other fees outstanding for that licence.
  3. Generate the control number. Every Mainland government charge is billed through the Government e-Payment Gateway (GePG). The control number carries the amount and currency.
  4. Pay by bank or mobile money. Pay the exact amount on the control number before it expires.
  5. Keep the receipt. Download the GePG receipt and check that the portal shows the licence as paid.

If the portal and a paper invoice disagree, ask the Commission in writing which governs. The amount on the GePG control number governs on the day of payment.

What happens if annual rent is not paid?

Late rent exposes the holder to three separate consequences: a cash penalty, a default notice and loss of the licence.

StageConsequenceBasis (2019 text)
Rent due and unpaidRent remains owed; the portal flags the licence as overduereg. 11(1); First Schedule
90 days after the due datePenalty on top of the rent: 25% of the amount due for an individual, 50% for a body corporates.66(1)
Penalty paidNo exemption from any other liability under the Acts.66(2)
Still unpaidUnpaid annual rent is a debt recoverable in a court of competent jurisdictions.66(3)
Default notice served30 days from service to remedy the defaults.63(2)
Default not remediedSuspension or cancellation of the mineral rights.63(1)
After cancellationRights end; liabilities already incurred survives.63(7)
ChallengeJudicial review in the High Court within 60 days of the decisions.65(1)

Section 63(1)(a) covers a holder who "fails in a material respect to comply with any requirement of this Act or the Regulations". Rent is such a requirement. Section 63(2) bars the licensing authority from acting unless it "has first served on the holder a default notice specifying the grounds". The holder must then have failed to remedy within "thirty days from the date on which the default notice was served".

The 30 days run from service, not from the date on the letter. Record the day the notice reached you. A default notice, a cancellation or a court claim for unpaid rent should go to an advocate the day it arrives. Our guide to appealing a licence refusal or revocation sets out the review route.

What changed in April 2026: 40 licences cancelled and 43 notices

The Mining Commission published a release headed "Serikali yafuta leseni 40 za utafiti wa madini" (Government cancels 40 mineral exploration licences). The Commission's site blocked our reader, so the details below come from two independent reports.

Neither report names annual rent separately or quotes a section. The Minister urged investors to follow the Mining Act, Cap. 123. The 30-day window matches section 63(2). The lesson is plain: unpaid fees, idle ground and local content gaps are now enforced together. A holder that pays rent but files no expenditure records is still at risk. Our note on local content ownership checks covers the participation side.

Which other recurring charges sit beside annual rent?

Rent keeps the licence alive. These other charges and duties run alongside it and are billed separately.

ObligationRate or amountPaid toRegister ID
Royalty on gross value6%, 5%, 4%, 3% or 1% by mineralMining CommissionF0624
Inspection fee1% of gross value, before export or domestic useMining CommissionF0625
HIV Response Levy0.1% of gross value, paid with royalty, from 1 July 2025Mining CommissionF0626
Service levy0.25% of turnoverLocal government authorityF0630
Prospecting licence minimum expenditureMost minerals USD 500, 2,000 and 6,000 a km2 by period; industrial minerals and building materials USD 100; gemstones USD 250Spent on the programme, not paid to GovernmentF0618
Prospecting licence renewal applicationUSD 300 (TZS 700,000)Mining CommissionF0617
Primary mining licence renewalTZS 100,000Mining CommissionF0619
Mining licence renewal applicationUSD 2,000; special mining licence USD 5,000Mining CommissionF0621

The HIV Response Levy was added as section 113A by the Finance Act 2025, as Clyde & Co noted on 21 August 2025. Royalty and the inspection fee are explained in our mineral royalty and inspection fee guide. The council's levy is covered in our service levy guide. Inspections of records and sites are covered in our note on Mining Commission inspections.

Does annual rent apply in Zanzibar?

No. Section 2 limits the Mining Act to Tanzania Mainland, so the Mining Commission, GN 1 of 2018 and every rent in this guide are Mainland matters.

PointMainland TanzaniaZanzibar
Governing lawMining Act, Cap. 123; GN 1 of 2018Zanzibar law; enacted text not confirmed
Licensing authorityMining CommissionUnknown
Annual rentPer km2 or per hectare, First ScheduleUnknown
Payment channelCadastre portal, GePG control numberUnknown

Worked example: a 10 sq km prospecting licence and a 2 sq km mining licence

A Tanzanian-incorporated company, part foreign-owned, holds two gold rights on the Mainland. We make three stated assumptions:

ItemRegister IDCalculationUSDTZS as printed
Prospecting licence rent, year 2F061610 km2 x USD 1001,0002,300,000
Mining licence rent, year 4F06212 km2 x USD 3,0006,00013,600,000
Annual rent, both licences7,00015,900,000

The prospecting licence anniversary falls on 15 November 2026, and the mining licence anniversary on 1 February 2027. If the prospecting licence is renewed in 2029 with the full area kept, its rent rises to USD 1,500 (10 x USD 150). If the mining licence were for building materials instead, its rent would be USD 4,000 (2 x USD 2,000).

The primary mining licence equivalent. A citizen holding a 10-hectare gold primary mining licence pays TZS 900,000 a year (10 x TZS 90,000, F0620). A 1.5-hectare licence for other minerals pays the TZS 90,000 minimum, because TZS 67,500 is below it.

The late scenario. The company misses the mining licence rent due on 1 February 2027.

An individual holder would face a 25% penalty instead, under section 66(1)(a). Zatra's professional fee for managing the calendar or the payment is quoted separately from these government charges.

What to do now

  1. List every licence. Record each right's number, grant date, area, mineral and holder entity in one schedule.
  2. Price the rent. Multiply the area by the current First Schedule rate, not the January 2018 figures.
  3. Diarise the anniversaries. Set reminders 60 and 30 days before each grant anniversary, and note renewal years when the rate rises.
  4. Check the portal. Log in, confirm nothing is overdue and download the receipts for the last three years.
  5. Pay against the control number. Generate the GePG control number on the portal and pay the exact amount before it expires.
  6. Clear arrears first. Pay any overdue rent before day 90 to avoid the 25% or 50% penalty.
  7. Answer any default notice. Note the date of service, remedy within 30 days and reply in writing with proof of payment.
  8. Fix the other gaps. File expenditure records and local content plans, and show work on the ground, so rent is not the only thing in order.
  9. Check rent in any deal. Before buying, farming into or transferring a licence, ask for the portal statement and receipts.

Key dates and deadlines

Date or triggerEventEffect
10 January 2018GN 1 of 2018 publishedRegulation 11 links annual rent to the First Schedule
9 February 2018GN 47 of 2018First Schedule replaced with the higher rents
18 October 2019 and 2022Further amendments to GN 1Primary mining licence fees and rents amended (GN 741 of 2019; GN 419 of 2022)
1 July 2025HIV Response Levy starts0.1% of gross value, paid with royalty (F0626)
10 to 15 April 2026Default notices and cancellations43 licences given notices; 40 exploration licences cancelled
On grantFirst year's rentBilled with the preparation fee; confirm on the portal
Each grant anniversaryAnnual rent dueConfirm the date on the portal
90 days after the due dateLate penalty25% individual, 50% body corporate (s.66(1))
30 days after a default notice is servedRemedy period endsSuspension or cancellation possible (s.63(2))
60 days after a decisionJudicial review deadlineHigh Court application (s.65(1))

How Zatra helps

Zatra's sector business permits service builds the licence schedule, prices each year's rent, tracks anniversaries and renewals, and prepares replies to default notices. Our investment due diligence service checks rent, receipts and expenditure records before a licence deal. See also our Tanzania mining page, the government fees handbook, pricing and contacts.

Annual rent, royalty, levies and renewal fees are paid by the client to the Mining Commission or the council at the official rate against a GePG control number. They are separate from Zatra's professional fee and are never marked up.

The Mining Commission and the Minister decide every grant, renewal, suspension and cancellation. Zatra prepares and coordinates the file; it does not decide or guarantee any authority's outcome. Default notices that may end in cancellation, court claims for unpaid rent, judicial review and formal legal opinions go to Zatra's advocate.

Sources and status

Accurate as at 20 October 2026. Fees are from the Zatra fee register at 26 September 2026.

Figures to confirm before you act

This article is general information based on official sources available at the date of publication. It is not legal, tax or financial advice. Laws and notices change. Verify with the issuing authority or consult Zatra before acting.

Frequently asked questions

Is annual rent refunded if a licence is surrendered part way through the year?

We found no refund rule in GN 1 of 2018. Regulation 15(2) requires a primary mining licence holder to clear arrears of rent and royalty before surrender, which points the other way. Budget on the basis that rent paid for a licence year is not returned, and ask the Commission in writing if the sum is large.

Does relinquishing part of a prospecting licence area reduce the rent?

Rent is charged per square kilometre, so a smaller retained area should mean a smaller bill from the next licence year. The reduction applies once the Commission records the new area on the cadastre. Check that the portal shows the reduced area before you pay the next year's rent.

Can a holder pay several years of rent in advance?

The regulations speak of annual rent, payable year by year. We found no rule allowing or barring advance payment. A holder that wants certainty should pay each year on time and keep the receipts, rather than rely on an informal credit.

Who pays the rent when a licence is being transferred?

Regulation 18 keeps the assignor liable for fees and rents until the assignment is complete. In the sale agreement, require the seller to show a clean portal statement at signing and at completion. Agree who pays any rent falling due in between, and hold back part of the price to cover it.

Is annual rent deductible for income tax?

Rent paid to keep a mineral right is a cost of the mining or exploration business. How it is treated, and whether it is ring-fenced to a licence area, depends on the Income Tax Act rules for mining. Ask a tax adviser or Zatra's tax desk before filing the return.

Can the Commission cancel a licence for late rent without any warning?

Not under section 63 as we read it. The licensing authority must first serve a default notice stating the grounds, and the holder has 30 days from service to remedy. Cancellation for ineligibility under section 63(3) follows a different route, so read any notice closely.

Does a mineral dealer or broker pay annual rent?

No. Dealers and brokers hold trading licences, not mineral rights over land. They pay yearly licence fees instead: for a dealer, USD 1,000 for gold, metallic minerals and coloured gemstones (F0622); for a broker, TZS 200,000 (F0623).

What if the payment was made but the portal still shows the licence overdue?

Keep the GePG receipt and the control number. Write to the Commission's cadastre office with both, and ask for the record to be corrected. Do this before day 90, so the penalty clock does not run against a payment already made.

Sources & regulators

Verify before filing: Rates, forms and thresholds move by Finance Act, Government Notice and portal revision. Confirm the live schedule on the mandate-holder portal before you budget or submit. Law-firm alerts and Big Four notes are discovery only.

Brief the desk

This Insights page is orientation. Sector business permits is the commercial desk for the same facts. Zatra’s fee stays on its own line, separate from government, bank and regulator charges. Approvals are not guaranteed.

Book a 20-minute file check Mineral royalty and inspection fee guide

+255 788 466 212 · [email protected] · WhatsApp +255 747 912 965

Disclaimer

This article is informational orientation. It is not legal, tax or investment advice and not a government decision. Tanzanian instruments move by Act, Government Notice, Finance Act and portal revision. If a sentence here disagrees with the live mandate-holder, the mandate-holder wins. Zatra Consultants Limited does not issue licences, permits, tax clearances or approvals, and gives no assurance of any regulatory or banking outcome. Professional fees are published only on /pricing/.