Mining & Minerals

Gypsum Mining Tanzania: Deposits, Licences, Royalty, Cement Buyers and Zanzibar

Cover: gypsum mining Tanzania, licences, royalty, cement and plaster-board buyers
Gypsum feeds two local industries: cement plants that need it as a set retarder and plaster-board lines that need it as the product itself.
Direct answer

What licence and royalty apply to gypsum mining in Tanzania? Gypsum is an industrial mineral under the Mining Act, Cap. 123 R.E. 2023, not a building material. Citizens can mine it under a primary mining licence; larger or foreign-backed projects need a mining licence or special mining licence. Royalty is 3% of gross value, plus a 1% inspection fee and a 0.1% HIV levy.

Gypsum mining in Tanzania serves a buyer base that sits inside the country. Cement plants blend gypsum into clinker, and plaster-board factories turn it into board and plaster. This guide covers where the deposits are, which licence fits which project, what the royalty and fees come to, the export and processing rules, the environmental file and how Zanzibar differs. It closes with a worked example for a 50,000-tonne-a-year operation.

What the law says

The governing statute is the Mining Act, Cap. 123 R.E. 2023, issued by the Office of the Attorney General. Section 2 states that the Act applies to Mainland Tanzania. The Mining Commission grants and supervises mineral rights under section 24.

The classification point decides almost everything else. Section 4(1) defines "industrial minerals" to include phosphate, kaolin, lime, gypsum and salt, and other non-metallic minerals normally used in industry. The same section defines "building materials" as rock, stone, gravel, sand and clay used for construction, and expressly leaves out gypsum, limestone burned for lime and cement materials.

So a gypsum pit is not a quarry in the legal sense. The short-term building-materials route described in our quarry and building materials licence guide does not cover it. The same is true of limestone dug to feed a cement kiln.

Three licence classes can authorise mining of an industrial mineral. Section 4(1) separates them by capital:

Money flows under Part VI. Section 111 sets royalties, section 115 deals with inspection centres and the inspection fee, and section 117 covers licence charges. The amounts sit in the Mining (Mineral Rights) Regulations, GN 1 of 2018 as amended, including GN 937 of 2020, which added new forms.

Who should read this

Readers new to the sector can start with our overview of mining licences in Tanzania.

Where is gypsum found in Tanzania?

The Ministry's Investor's Guide: Tanzania Mining Sector 2024, published through the Geological Survey of Tanzania, places evaporite minerals in the Rift Valley and in younger formations along the coastal belt. It lists gypsum among the country's industrial minerals but gives no site tonnages. The earlier 2015 Investor's Guide of the then Ministry of Energy and Minerals is equally general.

Named sites come from a peer-reviewed review in the Journal of the Southern African Institute of Mining and Metallurgy, October 2025. The table below follows that paper and recent press reports.

AreaRegionWhat the sources say
Pindiro and Mandawa, Kilwa DistrictLindiDescribed as the largest deposit, with historical data of over 5 million tonnes at about 85% gypsum (SAIMM review)
Kiranjeranje, KilwaLindiLarge-scale mining that supplies Knauf Gypsum Tanzania at Mkuranga (SAIMM review)
Msagali and ItigiCentral Tanzania (the paper lists Singida)Named as gypsum occurrences (SAIMM review)
MkomaziTangaNamed as a gypsum occurrence (SAIMM review)
Makanya and Ruvu Jeungeni, Same DistrictKilimanjaroSmall-scale gypsum mining and trade with cement makers (SAIMM review; Daily News)
Lindi and Mtwara marketsLindi, MtwaraSmall-scale miners selling to cement plants (The Respondent, May 2026)

None of these names is a licence map. Before any offer to buy or apply, search the Mining Cadastre for existing rights over the ground. Our guide to the mining cadastre and online applications explains the search.

Who buys Tanzanian gypsum?

Demand is domestic and industrial. Cement plants add a small share of gypsum to ground clinker to control setting time. Plaster-board and plaster makers use it as the main raw material.

The SAIMM review reports gypsum output rising from about 278,000 tonnes in 2018/2019 to about 620,000 tonnes in 2023/2024. The authors link the rise to growth in construction. The same paper reports limestone output of about 8.9 million tonnes in 2023/2024 and names Twiga, Simba and Tembo cement among the plants fed by large-scale limestone mining.

Price is the live issue. The Respondent reported on 15 May 2026 that the Deputy Minister for Minerals met miners, cement makers and processors at the Mining Commission in Dodoma on 14 May 2026. Miners said prices had not moved since 2016 and tabled these figures per tonne:

Delivery marketCurrent price reported (TZS per tonne)Miners' proposal (TZS per tonne)
Dar es Salaam and Coast Region110,000150,000
Mkuranga95,000130,000
Mtwara75,00095,000
Kiranjeranje60,00075,000

These are negotiating figures reported by the press, not official prices. The Daily News reports that buying gypsum below the Mining Commission's indicative price is prohibited. The Commission publishes a periodic indicative price list for building and industrial minerals. Check the current gypsum line before signing an offtake.

Which licence does a gypsum project need?

The licence follows the size of the project and the nationality of the holder. The table compares the three routes under the R.E. 2023 numbering.

PointPrimary mining licenceMining licenceSpecial mining licence
Scale (s.4(1))Small scale, capital up to USD 5mMedium scale, USD 100,000 to USD 100mLarge scale, USD 100m or more
Who may hold itTanzanian citizens only (s.9)Any qualified person or company (s.9)Any qualified person or company (s.9)
Applications.64s.59s.51
Grants.65s.60s.52
Term7 years (s.65(2))Up to 10 years initially (s.60(2))Life of the ore body or period applied for, whichever is shorter (2019 text; confirm the R.E. 2023 section)
Start of miningWithin 6 months (s.65(5))Within 18 months (s.62(a))As set in the licence and mine plan
Renewal windowApply at least 3 months before expiry (s.66(1))Apply at least 6 months before expiry, up to 10 years (s.63)As provided in the Act
State interestNoneFree carried interest of not less than 16% (s.11)Free carried interest of not less than 16% (s.11)

A PML suits a citizen or citizen-owned company working a defined pit with light equipment. Section 64(2) requires the prescribed form and fee, a sketch plan within the prescribed maximum area, a TIN, an integrity pledge and a local content plan. Section 64(3) adds environmental investigations, a social study and an environmental protection plan. Our primary mining licence guide walks through the file.

A mining licence fits a plant-scale supplier. Section 59(2) asks for the prospecting licence reference, a feasibility study, a training plan for Tanzanians and an expatriate succession plan. It also requires a procurement plan, a tax clearance certificate and a local content plan. Section 60(1)(e)(vi) lets the Commission refuse an application that lacks an environmental certificate.

Few gypsum projects reach the USD 100 million line for an SML. A vertically integrated cement or board group might. Most investors will look at a prospecting licence first, then an ML. See our prospecting licence guide for that first step.

Note the one-year term in section 65(4). It applies to PMLs for sand and fast-depleting building materials. Gypsum falls outside that definition, so the seven-year PML term in section 65(2) is the relevant one.

Can a foreign company mine gypsum in Tanzania?

Yes, but not under a PML. Section 9 reserves primary mining licences for Tanzanian citizens, with narrow room for approved foreign technical support. A foreign-owned company would hold a prospecting licence and then a mining licence or SML.

On an ML or SML, section 11(1) gives the Government not less than 16% non-dilutable free carried interest shares in the mining company. Confirm with the Commission how this is applied to an industrial-minerals ML before closing the shareholder agreement.

A foreign buyer can also sit downstream. A cement or board company can buy from licensed citizen miners under a long-term offtake. That route needs a clear price clause tied to the Commission's indicative price, quality specifications and evidence that royalty was paid before the ore left the mine. Our note on offtake and agency agreements sets out the clauses.

What royalty and fees apply to gypsum?

Royalty is set by section 111(1). Under the earlier text, section 87(1)(e) of the 2019 consolidation on TanzLII charged 3% on "other minerals", including building materials, salt and all minerals in the industrial minerals group. Zatra's fee register at 26 September 2026 records 3% for building and industrial minerals under section 111(1) of R.E. 2023 (F0624). Phosphate or limestone used for fertiliser, and salt, are at 1%.

Two further charges ride on the same gross value. The inspection fee is 1% under section 115(3) to (5) (F0625). The HIV Response Levy of 0.1% under section 113A, inserted by the Finance Act No. 11 of 2025, is paid with royalty (F0626). Clyde & Co, 21 August 2025, describes the levy and its split between the AIDS Trust Fund and the health insurance fund.

Register IDChargeAmountBasis
F0624Royalty, building and industrial minerals3% of gross valueCap. 123 R.E. 2023 s.111(1)
F0625Inspection fee1% of gross values.115(3) to (5)
F0626HIV Response Levy0.1% of gross values.113A (Finance Act No. 11 of 2025)
F0619PML application; preparation; renewal; transferTZS 50,000; 50,000; 100,000; 500,000GN 1 of 2018 as amended by GN 741 of 2019
F0620PML annual rent, other mineralsTZS 45,000 per ha (minimum TZS 90,000 under 2 ha)GN 1 of 2018, First Schedule item 8
F0621ML application; preparation; annual rent for building and industrial mineralsUSD 2,000; USD 1,000; USD 2,000 per km2GN 1 of 2018 as substituted by GN 47 of 2018
F0621SML application; preparation; annual rentUSD 5,000; USD 2,000; USD 5,000 per km2As above
F0618Prospecting minimum expenditure, industrial mineralsUSD 100 per km2GN 1 of 2018, reg. 9
F0629Withholding on purchases from PML holders2%, finalIncome Tax Act Cap. 332
F0630Council service levy0.25% of turnoverLocal Government Finance Act Cap. 290

Gross value is defined in section 4(1) as the market value at the point of refining or sale, or at delivery where the mineral is consumed in Tanzania. The Commission tests declared values against its indicative prices. A low invoice price does not lower the royalty base. Our post on royalty and the inspection fee covers the payment steps.

How does royalty work when ore leaves the pit?

Section 20 bars anyone from removing minerals from a mine for export or domestic use unless the conditions in section 115 are met. In practice the ore is declared, valued, and royalty, inspection fee and levy are paid against a control number before the trucks move. The Commission then issues the clearance paperwork for the load.

The buyer has a stake in this. A cement plant that receives uncleared gypsum risks seizure of the stock and questions over its own records. Ask every supplier for the clearance document that matches each delivery note. Where the seller holds a PML, the buyer must also withhold 2% as a final tax and remit it to TRA (F0629).

Do processing, dealer and export rules apply?

Three further permissions can arise once gypsum moves beyond the pit.

Raw exports face a policy wall. The Chanzo reported on 20 November 2026 that the Minerals Minister told the Tanzania Mining and Investment Conference that no stone would leave the country unprocessed. Section 128 of R.E. 2023 deals with control over removal of raw minerals, and section 69 lets the Minister set a share of output for in-country processing. Whether a given gypsum grade counts as "raw" for export is a question to settle with the Commission in writing. Our post on mineral value addition covers the policy.

What do local content and community rules require?

Part VIII of the Act carries the local content and community duties. Section 133 requires holders to give preference to goods and services from Tanzanian entrepreneurs. Section 134 covers training and employment of Tanzanians. Section 136 covers corporate social responsibility, and section 137 the integrity pledge.

The detail sits in the Mining (Local Content) Regulations, 2018 as amended. A local content plan is a required part of both the PML file (s.64(2)) and the ML file (s.59(2)(l)). For a gypsum project this usually means local haulage, local fuel and local security contracts, with annual reports to the Commission. Our guide to mining local content and ownership checks explains the reporting.

What does NEMC require for a gypsum mine?

Section 81(1) of the Environmental Management Act, 2004 (now Cap. 191) obliges the developer of a listed project to carry out an environmental impact assessment at its own cost. Mining projects go through NEMC for an environmental certificate. The Mining Act makes that certificate a condition for an ML (s.60(1)(e)(vi)). For a PML, section 64(3) requires environmental investigations and a protection plan with the application.

Register IDNEMC chargeAmount (TZS)
F0495EIA application; project brief or scoping report50,000; 150,000
F0498EIA review, Type A extractive, project cost below TZS 1bn; TZS 1bn to 4.99bn5,000,000; 8,000,000
F0508Annual compliance fee, cement plant; lime plant (category 17)4,500,000; 1,500,000

Confirm with NEMC the project category and the annual compliance fee for the mine itself, since gypsum pits are not named in the category lines quoted. The Daily News report from Same also notes that miners must rehabilitate and backfill pits after work ends. Our note on environmental obligations after the EIA covers monitoring and closure.

How is Zanzibar treated?

The Mining Act does not reach Zanzibar. Section 2 limits it to Mainland Tanzania, so a Mining Commission licence gives no right to dig in Unguja or Pemba. The Citizen reported on 28 November 2024 that Zanzibar had no dedicated mining law and was preparing one, with extraction handled meanwhile under its 2015 environmental law.

PointMainlandZanzibar
Mining lawMining Act, Cap. 123 R.E. 2023No dedicated mining law reported as at November 2024; check whether one has since been enacted
Licensing bodyMining CommissionZanzibar Government authorities; confirm the desk
Royalty on gypsum3% plus 1% inspection fee and 0.1% levyNot covered by Cap. 123; confirm locally
EnvironmentNEMC under Cap. 191Zanzibar environmental law of 2015
VAT on sales18%, TRA15%, ZRA

A Zanzibar plant that buys Mainland gypsum deals with the Mainland rules at the pit. The ore should arrive with royalty paid and clearance papers in order.

Worked example: a 50,000-tonne gypsum supplier

Take a citizen-owned company with a PML near Kiranjeranje. It sells 50,000 tonnes a year at the pit at TZS 60,000 per tonne, the current price reported by The Respondent in May 2026. Assume the Commission accepts that price as the gross value.

The buyer withholds 2% of the purchase price as final tax (F0629): 3,000,000,000 × 0.02 = TZS 60,000,000. That is a tax on the seller's income, deducted at source, not an added cost.

Now move the point of sale. If the same 50,000 tonnes are sold delivered in Dar es Salaam at TZS 110,000, gross value becomes TZS 5,500,000,000. Royalty rises to TZS 165,000,000, the inspection fee to TZS 55,000,000 and the levy to TZS 5,500,000. Haulage cost does not reduce the base unless the Commission accepts a pit-gate valuation, so agree the valuation point before pricing.

A foreign-backed company would need a mining licence instead. On a 1 km2 ML, annual rent is USD 2,000 (F0621), with a USD 2,000 application fee and USD 1,000 preparation fee. Royalty, inspection fee and levy are the same percentages. Keep USD and TZS totals separate; do not add them.

What to do now

  1. Confirm the mineral class. Record in the file that gypsum and cement limestone are industrial minerals under section 4(1), not building materials.
  2. Search the cadastre. Check the target ground for existing rights, reserved areas and tender areas before any land talks.
  3. Choose the licence. Use a PML for a citizen pit with light equipment; use a prospecting licence and then an ML for plant-scale or foreign-backed supply.
  4. Start the environmental file. Register the project with NEMC and commission the EIA or environmental protection plan early, since an ML can be refused without the certificate.
  5. Write the local content plan. Name local haulage, fuel, security and labour sources, and set a training plan.
  6. Fix the price and valuation point. Tie offtake prices to the Commission's indicative price and agree where gross value is measured.
  7. Set up royalty clearance. Build a routine so royalty, inspection fee and levy are paid and cleared before each load leaves the mine.
  8. Add downstream permits. Apply for a processing, dealer or export licence where calcining, trading or export is planned, and get the Commission's written view on raw-export status.

Key dates and deadlines

EventDate or periodSource
HIV Response Levy in force1 July 2025Finance Act No. 11 of 2025; register F0626
Mining Act R.E. 2023 issued by the Government Printer1 July 2025 (OSG record)OSG e-Library
Gypsum price meeting at the Mining Commission14 May 2026The Respondent, 15 May 2026
Raw-export ban reaffirmed at TMIC 202619 November 2026The Chanzo, 20 November 2026
Start mining after PML grantWithin 6 monthss.65(5)
Start mining after ML grantWithin 18 monthss.62(a)
PML renewal applicationAt least 3 months before expirys.66(1)
ML renewal applicationAt least 6 months before expirys.63(1)
Royalty, inspection fee and levyBefore minerals leave the miness.20, 113A, 115

How Zatra helps

Zatra's mining desk prepares PML, prospecting and mining licence files, local content plans and the royalty clearance routine. We coordinate the NEMC process with registered environmental experts and draft offtake terms for cement and board buyers. Our sector permits team handles the business licence, TIN and dealer or processing licences, and our tax compliance service sets up withholding, VAT and service levy.

Two cost buckets stay separate. Government fees are quoted at the official rate with their register IDs and paid to the Mining Commission, NEMC, TRA or the council against the authority's control number, never marked up. Zatra's professional fee is quoted on its own line.

A licence refusal appeal, a seizure of minerals, a boundary or compensation dispute, a prosecution under the Mining Act, or a formal legal opinion for a lender goes to an advocate. Zatra prepares and coordinates the file. Zatra does not decide or guarantee any authority's outcome.

Sources and status

Accurate as at 26 November 2026. Fee figures come from Zatra's fee register at 26 September 2026. Site names and prices come from a peer-reviewed review and press reports, attributed in the text.

Figures to confirm before you act

This article is general information based on official sources available at the date of publication. It is not legal, tax or financial advice. Laws and notices change. Verify with the issuing authority or consult Zatra before acting.

Frequently asked questions

Is gypsum treated as a building material for licensing?

No. The Act's definition of building materials expressly excludes gypsum, limestone burned for lime and cement materials. Gypsum is listed as an industrial mineral, so the one-year sand and building materials PML term does not apply to it.

Can a cement company mine its own limestone?

Yes, if it holds the right licence over the deposit. Cement limestone is an industrial mineral, so a plant usually needs a mining licence or SML, an environmental certificate, a local content plan and royalty clearance for every tonne moved to the kiln.

Does a gypsum buyer pay royalty?

The licence holder normally pays royalty, inspection fee and levy before the ore leaves the mine. Where minerals are sold to a licensed dealer or broker, the Act places the royalty on that dealer or broker. Buyers should demand clearance papers for each load.

Can two citizens share one primary mining licence?

A PML can be held by a citizen or by a company or cooperative owned by citizens. Partners often register a company and apply in its name, which makes later transfer and financing simpler. A PML transfer costs TZS 500,000 (F0619).

Is agricultural gypsum taxed differently from cement gypsum?

The register's 1% royalty line names phosphate or limestone used for fertiliser, not gypsum. Unless the Commission confirms otherwise in writing, assume gypsum sold for soil treatment pays the 3% industrial minerals rate.

What happens if royalty is underpaid?

The Commission can make a provisional assessment of royalty under section 113 and stop minerals leaving the mine until payment. Repeated default can lead to suspension or cancellation of the licence. A seizure or prosecution should go to an advocate at once.

Can a Kenyan or Ugandan buyer import Tanzanian gypsum directly?

Any export needs a mineral export permit and royalty clearance, and the raw-export policy may require processing first. A foreign buyer usually contracts with a Tanzanian dealer licence holder who handles clearance and export documents.

Does a plaster-board factory need a mining licence?

Not if it buys cleared ore and only manufactures. It needs its business licence, NEMC certificate and tax registrations. If it calcines gypsum on a mine site or mines its own ore, a processing licence or mineral right may also apply.

Sources & regulators

Verify before filing: Rates, forms and thresholds move by Finance Act, Government Notice and portal revision. Confirm the live schedule on the mandate-holder portal before you budget or submit. Law-firm alerts and Big Four notes are discovery only.

Brief the desk

This Insights page is orientation. Mining in Tanzania is the commercial desk for the same facts. Zatra’s fee stays on its own line, separate from government, bank and regulator charges. Approvals are not guaranteed.

Book a 20-minute file check Talk to Zatra

+255 747 912 965 · [email protected] · WhatsApp +255 747 912 965

Disclaimer

This article is informational orientation. It is not legal, tax or investment advice and not a government decision. Tanzanian instruments move by Act, Government Notice, Finance Act and portal revision. If a sentence here disagrees with the live mandate-holder, the mandate-holder wins. Zatra Consultants Limited does not issue licences, permits, tax clearances or approvals, and gives no assurance of any regulatory or banking outcome. Professional fees are published only on /pricing/.