Limestone Mining Tanzania: Licences, Royalty, NEMC Fees and Cement Buyers on the Mainland

Which licence and taxes apply to limestone mining in Tanzania? On the Mainland, limestone for cement or lime is an industrial mineral under the Mining Act, Cap. 123. Citizens may use a Primary Mining Licence; larger or foreign-owned projects need a Mining Licence. Royalty is 3% of gross value, or 1% for fertiliser limestone, plus a 1% inspection fee, a 0.1% HIV levy and a NEMC fee of TZS 5,000 per tonne.
This guide sets out how limestone mining Tanzania projects are licensed and taxed on the Mainland. It covers limestone quarried for cement, burnt for lime, ground for agricultural lime, and crushed for aggregates. Each use can land in a different legal class, and the class decides the licence, the royalty and the environmental fee. Figures come from the Zatra fee register, stated at 26 September 2026, with register IDs, and from the Mining Act text published on TanzLII.
What the law says
The Mining Act, Cap. 123 governs every mineral right on the Mainland. Section 2 of the revised text on TanzLII states that the Act applies to Tanzania Mainland. The Mining Commission, known as Tume ya Madini, issues the licences and collects royalty.
Section 4 holds the two definitions that decide where limestone falls. "Building materials" covers rock, stones, gravel, sand, clay and similar minerals used to build houses, roads, dams and aerodromes. The same definition then excludes gypsum, limestone burned to produce lime, and material used to manufacture cement.
"Industrial minerals" means a group of non-metallic minerals normally used in industry. The listed group includes lime, gypsum, dolomite, pozzolana, kaolin and phosphate. The definition of mineral concentrate also names limestone among industrial and ceramic minerals.
The result is a split by end use. Limestone sent to a cement kiln or a lime kiln is an industrial mineral. Limestone crushed into aggregate for a road or a building can be a building material. Agricultural lime carries its own royalty line. We read these definitions in the 2019 revised text. The register cites the Revised Edition 2023 for the royalty and inspection fee sections, so confirm the R.E. 2023 numbering of sections 2 and 4 before you quote them in a filing.
Who is affected
- Cement producers that run captive limestone quarries beside their kilns.
- Citizen miners who supply limestone to cement plants under Primary Mining Licences.
- Lime producers that burn limestone in kilns for construction, water treatment or industry.
- Agricultural lime suppliers who grind limestone for acid soils.
- Quarry operators who crush limestone into aggregate, chippings or base course.
- Traders who buy and resell limestone, and foreign investors weighing a cement or lime project.
If your stone is granite or basalt for roads only, the quarry and building materials licence guide fits better. For the sister industrial mineral, read our gypsum mining guide.
How is limestone classified, industrial mineral or building material?
The class follows the buyer and the use, not the rock. The Mining Officer looks at where the stone goes and how it is processed. The table below sets out the working position we draw from section 4.
| End use | Likely class | Royalty (F0624) |
|---|---|---|
| Cement raw material | Industrial mineral | 3% of gross value |
| Burnt for quicklime or hydrated lime | Industrial mineral | 3% of gross value |
| Ground for fertiliser or farm lime | Industrial mineral, fertiliser line | 1% of gross value |
| Crushed aggregate, chippings, base course | Building material | 3% of gross value |
| Dimension stone or blocks | Confirm with the Mining Officer | 3% of gross value |
The royalty rate is the same 3% for the first and fourth rows. The difference shows up in the NEMC production fee, which is charged per tonne for industrial minerals and per cubic metre for building materials. A quarry that serves both a cement plant and road contractors should keep separate dispatch records for each stream.
Which licence do you need to mine limestone?
The Mining Act ties the licence to scale, capital and ownership. The 2019 text defines a Primary Mining Licence as small scale mining with initial capital not above USD 5 million. A Mining Licence covers medium scale operations with capital between USD 100,000 and USD 100 million. A Special Mining Licence covers capital of USD 100 million or more.
Section 8 restricts Primary Mining Licences to Tanzanian citizens, and to partnerships and companies controlled by citizens. A foreign-owned cement company therefore cannot hold a PML. It must apply for a Mining Licence or Special Mining Licence. Applications run through the online cadastre; see our note on mining cadastre applications.
| Licence | Who may hold it | Government fees (register) |
|---|---|---|
| Primary Mining Licence | Citizens and citizen-controlled entities only | F0619: application TZS 50,000; preparation 50,000; renewal 100,000; transfer 500,000 |
| PML annual rent | PML holders | F0620: other minerals TZS 45,000 per ha, minimum 90,000 under 2 ha |
| Mining Licence | Any eligible company, 16% free carried interest | F0621: application USD 2,000; preparation USD 1,000; renewal application USD 2,000 |
| ML annual rent | ML holders | F0621: USD 2,000 per km2 for building and industrial minerals |
| Special Mining Licence | Large projects | F0621: application USD 5,000; preparation USD 2,000; rent USD 5,000 per km2 |
For the detail of each route, read the Primary Mining Licence guide and the Mining Licence guide. A cement plant drawing several hundred thousand tonnes a year will usually sit in the Mining Licence class on capital alone.
Do you need a prospecting licence first?
A prospecting licence lets you drill and sample before you apply to mine. Large cement investors normally prove a limestone reserve this way, because kiln feed needs consistent chemistry for decades. The register lines below apply.
- Preparation fee: USD 300 for all minerals (F0615).
- Annual rent per km2: USD 100 in the initial period, USD 150 on first renewal and USD 200 on second renewal (F0616).
- Renewal application: USD 300 (F0617).
- Minimum annual expenditure: USD 100 per km2 for industrial minerals and building materials, against USD 500 for most other minerals (F0618).
The F0615 application fee is printed for metallic minerals, energy minerals and kimberlitic diamond. The register does not show a separate application amount for industrial minerals, so the Commission assesses it on filing.
What does a trader or lime kiln need?
A business that buys limestone from miners and resells it needs a mineral dealer licence. The register prices the coal and industrial minerals class at USD 500 for the licence, with a USD 200 non-refundable application fee (F0622). Renewal costs USD 100 to apply plus the class fee. The licence-holding company must be at least 25% Tanzanian-held.
A lime kiln changes the mineral by burning it. The Mining Commission issues processing licences under the Mineral Beneficiation Regulations. The application fee is TZS 150,000 (USD 200), with an annual fee equal to half the issue fee (F0631). Whether a given kiln or grinding mill needs this licence is a call for the Commission, so ask the Resident Mines Officer before you build. See our mineral processing licence guide.
A cement plant is also a factory. Its manufacturing side may need an industrial licence, covered in our note on the industrial licence under Cap. 46. Miners licensed under the Mining Act are outside the Business Licensing Act, but a trading arm may not be.
How much royalty and inspection fee apply to limestone?
Section 111(1) of Cap. 123 R.E. 2023 sets royalty on gross value. The register line F0624 prints 3% for other minerals, including building materials and industrial minerals. It prints 1% for phosphate or limestone used for fertiliser, a rate the register traces to the Finance Act No. 6 of 2024. The Ministry of Minerals investor guide on the GST site also lists 3% for the building materials and industrial mineral group.
| Charge | Rate | Register ID and basis |
|---|---|---|
| Royalty, cement or lime limestone | 3% of gross value | F0624, Cap. 123 s.111(1) |
| Royalty, fertiliser limestone | 1% of gross value | F0624, Finance Act 2024 |
| Inspection fee | 1% of gross value | F0625, s.115(3) to (5) |
| HIV Response Levy | 0.1% of gross value | F0626, s.113A, from 1 July 2025 |
| NEMC fee, limestone | TZS 5,000 per tonne | NEW-05-04, GN 588 of 2024 |
| NEMC fee, aggregates | TZS 2,000 per m3 | NEW-05-04 |
| Council service levy | 0.25% of turnover | F0630, Cap. 290 |
| Withholding on PML purchases | 2%, final | F0629, Cap. 332 |
The inspection fee is due before the mineral is cleared for export or domestic use. The HIV Response Levy is paid with royalty, and the register notes it splits 70% to the AIDS Trust Fund and 30% to the Universal Health Insurance Fund. A cement plant buying from a PML holder withholds 2% as a final tax. Our royalty and inspection fee guide explains how gross value is set.
What environmental approvals and NEMC fees apply?
The Environmental Management Act, Cap. 191 places environmental impact assessment in Part VI. A limestone quarry, a cement plant and a lime kiln each need an EIA certificate before work starts. Our EIA guide covers the stages.
- EIA application and brief: TZS 50,000 to apply; TZS 150,000 for a project brief or scoping report (F0495).
- Review of a Type A extractive project: TZS 5 million below TZS 1 billion project cost, rising to TZS 100 million at TZS 500 billion and above (F0498).
- Annual compliance fee, non-metallic industries: cement TZS 4.5 million; lime TZS 1.5 million (F0508).
- Production fee: industrial minerals per tonne, including limestone at TZS 5,000; building materials per m3, including aggregates at TZS 2,000 (NEW-05-04).
The per-tonne limestone fee is large relative to the price of raw stone. Confirm with NEMC how it applies to limestone a cement company quarries for its own kiln, and at what point the tonnage is measured.
What do local content, state participation and CSR require?
Section 10 of the Mining Act gives the Government not less than 16% non-dilutable free carried interest in every Mining Licence and Special Mining Licence. Clyde & Co notes that the Mining (State Participation) Regulations, GN 574 of 2022, apply to every such holder. A PML carries no free carried interest.
The Mining (Local Content) Regulations 2018 require local content plans and preference for Tanzanian goods, services and staff. GN 563 of 2025, published on 12 September 2025, tightened them. Clyde & Co's summary describes a list of goods and services reserved for indigenous Tanzanian companies and a new procurement sub-plan. Our local content guide covers the ownership checks.
The Mining (Corporate Social Responsibility) Regulations 2023, GN 409 of 2023, require mineral rights holders to agree a CSR plan with the host local government authority. Clyde & Co notes that this covers primary mining, mining and processing licence holders.
How do land, compensation and community rights work?
A mineral right does not extinguish surface rights. Before you open a pit, agree access with landholders and pay compensation for land, crops and structures. Village land needs village assembly engagement. Disputes over valuation are common on limestone ridges near towns, where land values rise fast. Our mining land compensation guide sets out the process. Route any contested valuation to an advocate.
Who buys Tanzanian limestone?
Cement plants are the anchor buyers. The USGS Minerals Yearbook for 2019, published in September 2023, lists plants at Mtwara, Wazo Hill in Dar es Salaam, Tanga, Mbeya, Kimbiji and Nazimuzubwi. It also lists a lime plant at Tanga. It reports crushed limestone output of 5.5 million tonnes in 2019.
Ownership has moved since 2019, so check the current owner before you approach any plant. The Daily News reported in June 2024 that a cement producer held a limestone site in Tanga and that Dangote ships cement from Mtwara to Dar es Salaam. TanzaniaInvest reported in December 2025 that Mbeya Cement signed contracts for new clinker lines in Mbeya and Tanga, citing limestone reserves. Global Cement reported in March 2024 that Huaxin Cement Tanzania Maweni had started a new plant.
Other buyers include lime producers, fertiliser blenders, sugar and water treatment plants, and road contractors. We did not verify any named project in the Lindi area, so we do not list one.
Can limestone or lime be exported?
Each export of minerals needs a mineral export permit from the Mining Commission. The application fee is USD 100 (F0628). Royalty and the inspection fee must be settled before clearance. The Mining Act also restricts export of raw minerals and concentrates, so confirm with the Commission whether your product needs beneficiation approval. See our mineral export permit guide.
How does Zanzibar differ from the Mainland?
The Mining Act applies to Tanzania Mainland only. A Mining Commission licence does not authorise extraction in Unguja or Pemba. We could not verify which Zanzibar instrument and authority license limestone or coral stone extraction, or what royalty applies. Treat the Zanzibar position as unknown until the relevant Zanzibar ministry confirms it in writing.
| Point | Mainland | Zanzibar |
|---|---|---|
| Governing law | Mining Act, Cap. 123 | Not verified |
| Licensing body | Mining Commission | Not verified |
| Royalty | 3%, or 1% for fertiliser | Not verified |
| Environmental approval | NEMC under Cap. 191 | Zanzibar has its own environment law; confirm locally |
Worked example: royalty, inspection fee and levies on 100,000 tonnes
Assume a citizen-owned company sells 100,000 tonnes of limestone to a cement plant in one year. Assume a gross value of TZS 25,000 per tonne. This price is our assumption for illustration only. Royalty is charged on the gross value the Commission accepts, which may follow its indicative prices.
| Item | Basis | Amount (TZS) |
|---|---|---|
| Gross value | 100,000 t x 25,000 | 2,500,000,000 |
| Royalty (F0624) | 3% | 75,000,000 |
| Inspection fee (F0625) | 1% | 25,000,000 |
| HIV Response Levy (F0626) | 0.1% | 2,500,000 |
| NEMC production fee (NEW-05-04) | TZS 5,000 per tonne | 500,000,000 |
| Service levy (F0630) | 0.25% of turnover | 6,250,000 |
| Total | Government charges | 608,750,000 |
The Mining Commission charges come to TZS 102.5 million, or 4.1% of gross value. The NEMC per-tonne fee is the largest line by far at this assumed price. If the same tonnage went to a fertiliser blender, royalty would fall to TZS 25 million. The total would then be TZS 558,750,000. If the buyer withholds 2% under F0629 on a PML sale, that is TZS 50 million, a final tax on the seller.
Add fixed costs. A Mining Licence over 2 km2 pays rent of USD 4,000 a year (F0621). A PML over 5 hectares pays TZS 225,000 a year (F0620). Keep the TZS and USD totals separate.
What to do now
- Fix the end use. Decide whether the stone goes to cement, lime, fertiliser or aggregate, and get the Resident Mines Officer's view on the class.
- Choose the licence. Citizens under USD 5 million capital can use a PML; foreign-owned or larger projects need a Mining Licence.
- Prove the reserve. Use a prospecting licence where kiln chemistry must be confirmed over many years.
- Start the EIA early. Register with NEMC and budget the review fee by project cost band.
- Settle land access. Agree compensation with landholders and the village before you clear ground.
- Prepare local content and CSR plans. File them with the Commission and the host council on time.
- Set up royalty records. Weigh every load, record its buyer and use, and pay royalty, inspection fee and levy against control numbers.
- Add trading or processing licences. Apply for a dealer or processing licence if you buy from others or run a kiln.
Key dates
- 23 June 2023: Mining (Corporate Social Responsibility) Regulations, GN 409 of 2023, published.
- 1 July 2024: Finance Act 2024 changes to royalty lines took effect, per the register.
- 19 July 2024: GN 588 of 2024 substituted the NEMC category 16 fees, including the limestone production fee.
- 1 July 2025: HIV Response Levy of 0.1% began, and the service levy rate of 0.25% applied.
- 12 September 2025: GN 563 of 2025 amended the Mining (Local Content) Regulations.
- Each year: PML and Mining Licence rent falls due on the licence anniversary.
- Each dispatch: royalty and inspection fee are settled before export or domestic clearance.
How Zatra helps
Zatra maps the licence route, prepares cadastre applications, coordinates EIA consultants and NEMC filings, drafts local content and CSR plans, and builds royalty budgets from the register. Our sector permits service handles the file end to end, and our Tanzania mining hub links related guides. Zatra prepares and coordinates the file but does not decide or guarantee any authority's outcome. Government fees are paid at the official rate against the authority's control number, separate from Zatra's professional fee. Route disputes, prosecutions, seizures and legal opinions to an advocate. See our pricing page or contact us.
Sources and status
Accurate as at 27 November 2026. Fee figures come from the Zatra government fees register, stated at 26 September 2026, which cites the gazetted instruments.
- Mining Act, Cap. 123, revised text as at 30 November 2019. TanzLII, 2019. Accessed 27 Nov 2026.
- Mining Commission (Tume ya Madini) functions. Mining Commission, 2026. Accessed 27 Nov 2026.
- Investor's Guide, Tanzania Mining Sector. Ministry of Minerals via GST, 2024. Accessed 27 Nov 2026.
- Environmental Management Act, Cap. 191. UNEP LEAP database, 2004 Act entry. Accessed 27 Nov 2026.
- The Mineral Industry of Tanzania, 2019 Minerals Yearbook. U.S. Geological Survey, September 2023. Accessed 27 Nov 2026.
- Free carried interest and state participation. Clyde & Co, 26 February 2024. Accessed 27 Nov 2026.
- Amendment to the Mining (Local Content) Regulations by GN 563 of 2025. Clyde & Co, 18 September 2025. Accessed 27 Nov 2026.
- The Mining (CSR) Regulations 2023. Clyde & Co, 22 August 2023. Accessed 27 Nov 2026.
- What cement stakeholders want in Finance Bill 2024. Daily News, 25 June 2024. Accessed 27 Nov 2026.
- Mbeya Cement EPC contract for clinker lines in Mbeya and Tanga. TanzaniaInvest, 17 December 2025. Accessed 27 Nov 2026.
- Huaxin Cement Tanzania Maweni new plant. Global Cement, 1 March 2024. Accessed 27 Nov 2026.
Figures to confirm before you act
- The R.E. 2023 section numbers for the application clause and the definitions, which we read in the 2019 text.
- How NEMC applies the TZS 5,000 per tonne limestone fee to captive cement quarries, and where tonnage is measured.
- The prospecting licence application fee for industrial minerals, which the register does not print separately.
- Whether a lime kiln or a grinding mill needs a processing licence, and whether a miner selling its own output needs a dealer licence.
- The gross value per tonne the Commission will accept for royalty on your product.
- Whether your council charges the service levy on mineral sales.
- The Zanzibar authority, law and fees for limestone extraction.
This article is general information based on official sources available at the date of publication. It is not legal, tax or financial advice. Laws and notices change. Verify with the issuing authority or consult Zatra before acting.
Frequently asked questions
Can a foreign company hold a Primary Mining Licence for limestone?
No. Section 8 of the Mining Act limits Primary Mining Licences to Tanzanian citizens and to partnerships or companies they control. A foreign-owned cement or lime company must apply for a Mining Licence, which carries the Government's 16% free carried interest, or buy limestone from licensed citizen miners.
Is limestone for road aggregate charged the same royalty as cement limestone?
Yes, both pay 3% of gross value under F0624. The difference is the NEMC production fee. Aggregates pay TZS 2,000 per cubic metre as a building material, while limestone as an industrial mineral pays TZS 5,000 per tonne. Keep separate weighbridge records for each stream.
Who pays royalty when a cement plant buys from a PML holder?
Royalty is a charge on the mineral right holder who produces and sells the mineral. In practice the Commission clears each consignment before it moves. The buying plant must also withhold 2% of the purchase price as final tax under F0629 and remit it to TRA.
Does agricultural lime qualify for the 1% royalty automatically?
Not automatically. The 1% line in F0624 covers limestone used for fertiliser. Expect the Mining Officer to ask for evidence of the buyer and end use, such as a fertiliser registration or supply contract. Without it, the default 3% rate for industrial minerals is likely to apply.
How long does a limestone mining licence application take?
We did not find a published national timeline for each licence class. Timing depends on cadastre checks, the EIA certificate, land access and, for a Mining Licence, local content and state participation steps. Plan in months, not weeks, and file the EIA early because it often sets the pace.
Do I need a business licence to sell limestone?
Miners licensed under the Mining Act are outside the Business Licensing Act for their mining activity. A separate trading company that buys from others needs a mineral dealer licence from the Mining Commission, priced at USD 500 for the industrial minerals class plus a USD 200 application fee.
Is limestone mining in Zanzibar covered by the Mining Commission?
No. The Mining Act applies to the Mainland only, so a Mining Commission licence has no effect in Unguja or Pemba. We could not verify the Zanzibar licensing law or fees for limestone. Confirm the position in writing with the relevant Zanzibar ministry before you invest.
What records should a limestone quarry keep for audits?
Keep weighbridge tickets, buyer names, end-use evidence, royalty and inspection fee receipts with control numbers, NEMC fee payments, and rent receipts. Keep EIA conditions and monitoring reports, local content filings and CSR reports. Commission auditors and NEMC inspectors usually ask for these first.
Sources & regulators
Verify before filing: Rates, forms and thresholds move by Finance Act, Government Notice and portal revision. Confirm the live schedule on the mandate-holder portal before you budget or submit. Law-firm alerts and Big Four notes are discovery only.
- Mining Act, Cap. 123 (revised text as at 30 November 2019): TanzLII, 2019; sections 2, 4, 8 and 10 read for application, definitions, PML restriction and state participation. Accessed 2026-11-27.
- Mining Commission (Tume ya Madini): Mining Commission, 2026; licensing, mineral trade and local content functions. Accessed 2026-11-27.
- Investor's Guide, Tanzania Mining Sector: Ministry of Minerals via GST, 2024; royalty table and industrial minerals list. Accessed 2026-11-27.
- Environmental Management Act, Cap. 191: UNEP LEAP, 2004 Act entry; Part VI environmental impact assessment. Accessed 2026-11-27.
- The Mineral Industry of Tanzania, 2019 Minerals Yearbook: U.S. Geological Survey, September 2023; cement and lime plant table, limestone output. Accessed 2026-11-27.
- The concept of free carried interest and state participation: Clyde & Co, 26 February 2024; 16% free carried interest, GN 574 of 2022. Accessed 2026-11-27.
- Amendment to the Mining (Local Content) Regulations 2018 by GN 563 of 2025: Clyde & Co, 18 September 2025; GN 563 of 2025 changes. Accessed 2026-11-27.
- The Mining (Corporate Social Responsibility) Regulations 2023: Clyde & Co, 22 August 2023; GN 409 of 2023. Accessed 2026-11-27.
- What cement stakeholders want in Finance Bill 2024: Daily News, 25 June 2024; cement producers and limestone sites. Accessed 2026-11-27.
- Mbeya Cement EPC contract for new clinker lines in Mbeya and Tanga: TanzaniaInvest, 17 December 2025; clinker line contracts. Accessed 2026-11-27.
- Huaxin Cement Tanzania Maweni new plant: Global Cement, 1 March 2024; plant start. Accessed 2026-11-27.
Disclaimer
This article is informational orientation. It is not legal, tax or investment advice and not a government decision. Tanzanian instruments move by Act, Government Notice, Finance Act and portal revision. If a sentence here disagrees with the live mandate-holder, the mandate-holder wins. Zatra Consultants Limited does not issue licences, permits, tax clearances or approvals, and gives no assurance of any regulatory or banking outcome. Professional fees are published only on /pricing/.