Mining & Minerals

Lithium Mining Tanzania: Licences, Royalty, Value Addition and the Critical Minerals Plan

Cover: lithium mining in Tanzania, licence route, royalty and value addition rules under the Mining Act
Lithium in Tanzania is still an exploration story. The licence route, royalty and processing rules are already fixed in law.
Direct answer

How do you get a licence for lithium mining in Tanzania? On the Mainland, apply through the Mining Commission's online cadastre under the Mining Act, Cap. 123 R.E. 2023. Explore under a prospecting licence, then move to a mining licence for capital of USD 100,000 to USD 100 million, or a special mining licence above that. Expect royalty, a 1% inspection fee, State equity and local processing rules.

Lithium mining in Tanzania sits at the exploration stage, but the legal route from first claim to export is already set. The Government lists lithium among the minerals in its new critical and strategic minerals plan, and it issued six lithium licences between July 2025 and March 2026.

This guide sets out that route on the Mainland under the Mining Act, Cap. 123 R.E. 2023. It covers the licence classes, the online cadastre, royalty, State equity, local content, the environmental certificate, the processing rules and the position in Zanzibar.

What the law says about lithium

The parent law is the Mining Act, Cap. 123 R.E. 2023, in the Office of the Solicitor General e-Library. Section 2 says: "This Act shall apply to Mainland Tanzania." We read the official R.E. 2023 PDF on 22 November 2026.

Where lithium appears. Section 4 defines "Mineral Concentrate" in groups, and paragraph (c), covering rare earth and transition elements, lists "(iv) lithium". The same paragraph covers the rare earths in our rare earth mining guide.

Where lithium does not appear. Section 4 defines "metallic minerals" as gold, silver, copper, iron, nickel, cobalt, tin, tungsten, zinc, chromium, manganese, titanium, aluminium, the platinum group "and other metallic minerals". Lithium is not named there or among the "industrial minerals", which matters for royalty and rent.

Supporting instruments. Four sets of rules do most of the daily work:

Older articles cite the TanzLII text as at 30 November 2019. We cite R.E. 2023 numbers and give the 2019 number where it helps.

Who should read this

Is lithium a critical or strategic mineral in Tanzania?

Lithium is named in Government policy, but no law yet gives it a separate legal regime.

TanzaniaInvest reported on 28 April 2026 that Minerals Minister Anthony Mavunde told Parliament on 27 April 2026 that the Ministry had finalised a Critical and Strategic Minerals Strategy. The strategy will take effect once the official list of critical and strategic minerals is approved. The target minerals named were lithium, graphite, helium, nickel, cobalt, titanium, copper, aluminium, niobium and rare earth elements.

The same report says the Mining Commission issued 454 licences for these minerals from July 2025 to March 2026, of which 6 were for lithium.

What that means in law. We found no gazetted list of critical minerals and no lithium-specific regulation as at 22 November 2026. Until a list or regulation is published, lithium follows the general Mining Act rules in this guide. Our mineral value addition guide tracks the strategy and the processing rules it is expected to tighten.

Which licence does a lithium project need?

The licence follows the stage of work and the size of the capital investment.

LicencePurpose and thresholdWho may hold itMain government fees (register ID)
Prospecting licence (PL)Exploration only; up to 300 km2 for metallic mineralsAny qualified person; foreign ownership allowedApplication USD 300; preparation USD 300; rent from USD 100 a km2 a year (F0615, F0616)
Primary mining licence (PML)Small-scale mining; initial capital not above USD 5 millionCitizens and wholly citizen-owned bodies only (s.9(2))Application TZS 50,000; rent TZS 45,000 a ha for other minerals (F0619, F0620)
Mining licence (ML)Medium scale; capital USD 100,000 to USD 100 millionTanzanian-incorporated company; foreign shareholders allowed for non-gemstone mineralsApplication USD 2,000; preparation USD 1,000; rent USD 3,000 or USD 2,000 a km2 (F0621)
Special mining licence (SML)Large scale; capital of USD 100 million or moreAs for ML; grant needs Cabinet approval (s.52)Application USD 5,000; preparation USD 2,000; rent USD 5,000 a km2 (F0621)

The capital bands come from the section 4 definitions of "mining licence" and "special mining licence" in R.E. 2023. A hard-rock lithium mine with a concentrator will often cost more than USD 100 million, which puts it in SML territory and before Cabinet.

Prospecting licence. Sections 38 to 46 govern the PL. Section 38(3) requires the application to state the mineral and area, financial and technical resources and a procurement plan. It must also include an integrity pledge (para. (g)) and a local content plan (para. (h)). Our prospecting licence guide covers the terms and renewals.

Mining licence. Section 59(2) requires a feasibility study, a requested term of up to ten years, a TIN and a valid TRA tax clearance certificate. It also requires a local content plan, an integrity pledge and a procurement plan. Our mining licence guide walks through the file.

Special mining licence. Section 51(3) adds a mineral deposit statement, a capital programme, a relocation and compensation plan and an employment and training plan. Paragraph (e) requires "the applicant's environmental certificate issued in terms of the Environmental Management Act". Under section 52 the Commission sends the application to the Minister for Cabinet approval before grant.

How does the Mining Cadastre portal work for lithium applications?

Section 36 establishes the Mining Cadastre. It receives and processes applications for mineral rights and processing licences, and keeps public cadastral maps and registers.

Applications run through the Online Mining Cadastre Transactional Portal. The applicant plots coordinates, uploads the file and pays against a GePG control number. Our Mining Cadastre guide covers accounts, payments and the area limits.

The Mining Commission decides the application. Section 9(7) also blocks a grant to an applicant in default on another mineral right. Our guide on a rejected mining licence application sets out the common refusal grounds and the response.

What does a lithium prospecting licence cost to keep?

Rent and minimum spending depend on the mineral class.

Mining Technology reported on 11 December 2023 that CGrowth Capital received seven prospecting licences in Dodoma Region "for metallic minerals, mainly lithium". Confirm the class on your own licence before you budget.

Duties. Section 46(1) requires the holder to start prospecting within three months of grant, follow the appended programme and spend the prescribed minimum. Missing them puts the holder in default. Our idle mining licences guide covers the notice and cancellation sequence.

What royalty applies to lithium in Tanzania?

Royalty sits in section 111 of R.E. 2023 (section 87 in the 2019 text). It is charged on gross value. The 2019 text sets five classes:

Zatra's fee register prints the same classes under section 111(1) as amended (F0624). Lithium is not named in either the 6% or the 3% class. If the Commission treats lithium as one of the "other metallic minerals" in section 4, it pays 6%. If it treats a spodumene concentrate as an industrial mineral, it pays 3%. We found no published ruling on the point.

ChargeRate or amountWhen it fallsRegister IDBasis
Royalty6% if metallic; 3% if other or industrialOn minerals sold or removedF0624Cap. 123 R.E. 2023 s.111
Inspection fee1% of gross valueBefore clearance for export or domestic useF0625Cap. 123 R.E. 2023 s.115
HIV Response Levy0.1% of gross valueWith royalty, from 1 July 2025F0626Cap. 123 s.113A, Finance Act 2025
Export permit applicationUSD 100Each export permitF0628GN 2 of 2018 as amended
Export tax, quartz and feldspar10% of FOB or TZS 200 a kg, whichever is higherOn export of those by-products, from 1 July 2026F0339Export Tax Act Cap. 196, Finance Act 2026
Service levy0.25% of turnoverTo the district councilF0630Local Government Finance Act Cap. 290

The levy. The Finance Act, 2025 (Act No. 11 of 2025) added section 113A, the 0.1% HIV Response Levy. Clyde & Co noted on 21 August 2025 that the levy is paid with royalty and split 70% to the AIDS Trust Fund and 30% to the Universal Health Insurance Fund.

Lithium pegmatites often carry quartz and feldspar, whose export now attracts export tax (F0339). Our royalty and inspection fee guide explains how gross value is fixed.

What stake does the Government take in a lithium mine?

Section 11(1) of R.E. 2023 gives the Government "not less than sixteen percent non-dilutable free carried interest shares" in a company holding a mining licence or special mining licence. Section 11(2) allows the Government to take up to 50% in total, linked to the tax expenditures the company receives.

The stake does not attach to a prospecting licence. It attaches at the ML or SML, so build the 16% into the model and shareholder documents from day one. Our free carried interest guide covers the mechanics, including a dilution worked example.

Can lithium ore or concentrate be exported?

Not as raw ore, and only under permit and value-addition rules once processed.

The Act. Section 20 of R.E. 2023 is headed "Restriction on exportation or domestic use of minerals". Section 128 is headed "Control over removal of raw minerals" and section 129 "Handling of mineral concentrates". We read those headings in the official text but could not open the operative words of sections 128 and 129 this session.

The Permanent Sovereignty Act. Section 9(1) requires that "no raw resources are exported for beneficiation outside the United Republic". Section 9(2) requires a commitment to build beneficiation facilities in the country.

The value addition regulations. GN 687 of 2020 governs which grades may be exported. We could not read its schedule, so we cannot state a minimum lithium grade. Ask the Commission for the export specification before you design a concentrator.

Policy. The Chanzo reported on 20 November 2026 that Minister Mavunde said: "Not a single stone will leave the country unprocessed, unrefined or unpolished." The Vice President said enforcement of the ban will continue.

Processing licences. Sections 70 to 72 create processing, primary processing and smelting or refining licences. Register line F0631 sets an application fee of TZS 150,000 (USD 200) for a processing licence and for a smelting or refining licence. See our processing licence guide and our mineral export permit guide.

What local content rules apply to lithium projects?

Section 133 of R.E. 2023 is headed "Provision of goods and services by Tanzanian entrepreneurs". Every PL, ML and SML application must carry a local content plan, and GN 3 of 2018 sets its content.

Clyde & Co reported on 18 September 2025 that GN 563 of 2025, published on 12 September 2025, tightened the rules:

Sections 136 to 138 add corporate social responsibility, the integrity pledge and compliance with environmental principles. Our local content ownership checks set out what the Commission tests.

Do you need an environmental certificate for lithium exploration and mining?

Yes for mining, and often for drilling programmes too. The Environmental Management Act, Cap. 191 applies to Mainland Tanzania (section 2(2)). Section 81 is headed "Obligation to undertake Environmental Impact Assessment". The National Environment Management Council (NEMC) registers and reviews the study.

For an SML, section 51(3)(e) of the Mining Act makes the environmental certificate part of the application itself. For an ML, the 2019 text lists it as a condition of grant (section 50(1)(g)). Our EIA guide explains registration, scoping and review.

NEMC chargeAmountRegister ID
EIA application; project brief or scoping reportTZS 50,000; TZS 150,000F0495
EIA review, Type A extractive, project cost TZS 50bn to 499.99bnTZS 50,000,000F0498
EIA review, Type A extractive, project cost TZS 500bn and aboveTZS 100,000,000F0498
Annual fee, major mining worksTZS 4,500,000F0505

Register line F0508 also prints a category 16 annual fee of TZS 100 million for a "mineral exploration or prospecting licence". That figure is large for an exploration file, so confirm with NEMC whether and how it applies before budgeting.

Worked example: a lithium project from licence to first sale

Example: a Tanzanian subsidiary of a foreign explorer takes a 100 km2 lithium PL in the metallic class. It later converts 8 km2 to a mining licence for a project costing USD 60 million. Figures use the fee register; the concentrate price is illustrative, not a forecast.

Prospecting, year 1. Application USD 300 and preparation USD 300 (F0615). Rent is 100 km2 x USD 100, or USD 10,000 (F0616). The minimum spend is 100 km2 x USD 500, or USD 50,000 (F0618). Government charges in year 1 total USD 10,600, plus the work commitment.

Mining licence, year 1. Application USD 2,000 and preparation USD 1,000 (F0621). Rent at the metallic rate is 8 km2 x USD 3,000, or USD 24,000. At USD 60 million the project sits under the USD 100 million SML threshold, so no Cabinet approval is needed. If the Commission applied the building and industrial rate, rent would be USD 16,000.

Environment. At an assumed TZS 2,500 to the dollar, USD 60 million is TZS 150 billion. That falls in the TZS 50bn to 499.99bn band, so EIA review costs TZS 50,000,000 plus the TZS 50,000 application (F0495, F0498).

First sales. Suppose the mine sells 60,000 tonnes of concentrate at an illustrative USD 1,000 a tonne, a gross value of USD 60,000,000.

ChargeAt 6% royalty (metallic)At 3% royalty (other)
Royalty (F0624)USD 3,600,000USD 1,800,000
Inspection fee, 1% (F0625)USD 600,000USD 600,000
HIV Response Levy, 0.1% (F0626)USD 60,000USD 60,000
Total on gross valueUSD 4,260,000USD 2,460,000

The class question is worth USD 1,800,000 a year here. The Government also holds 16% of the shares from the ML grant, and income tax and the 0.25% service levy come on top.

Government fees are paid to each authority against its control number at the official rate. Zatra's professional fee is quoted separately.

How do Mainland and Zanzibar differ?

Mining is not a Union matter. Section 2 of the Mining Act limits it to Mainland Tanzania, and section 2(2) of Cap. 191 does the same for the environmental regime.

PointMainlandZanzibar
Mining lawMining Act, Cap. 123 R.E. 2023No dedicated mining law reported as at November 2024; enactment since then not confirmed
Licensing bodyMining Commission, via the online cadastreNot confirmed
Royalty and inspection fees.111 and s.115 (F0624, F0625)Unknown
Environmental certificateNEMC under Cap. 191Zanzibar Environmental Management Act, 2015, and its own authority
Known lithium licencesSix issued July 2025 to March 2026, as reportedNone found

The Citizen reported on 28 November 2024 that Zanzibar had no dedicated mining law, relied on its 2015 environmental law and was preparing one. We could not confirm whether it has since been enacted. Shipping Mainland concentrate through a Zanzibar port does not avoid the Mining Commission's export permit.

Which lithium projects are known in Tanzania?

We found no lithium mining licence, special mining licence or framework agreement in official sources. Treat claims of a lithium "mine" in Tanzania with care until a licence number appears on the cadastre. Our graphite mining guide and our battery metals guide cover the more advanced battery-mineral projects.

What to do now

  1. Set up the holding company. Incorporate a Tanzanian company with a TIN, a physical address and directors who meet section 9. Plan for the 16% free carried interest at the ML stage.
  2. Check the ground. Search the cadastre for overlaps with gold, gemstone or graphite claims before you plot coordinates.
  3. Settle the mineral class. Ask the Commission in writing whether lithium is licensed as metallic or industrial. Keep the reply on the file.
  4. File a complete PL application. Include the programme, procurement plan, local content plan and integrity pledge required by section 38(3).
  5. Start work within three months. Meet the programme and the minimum spend under section 46, and pay rent every year.
  6. Register the EIA early. Open the NEMC file before drilling at scale and well before an ML or SML application.
  7. Design for local processing. Obtain the Commission's export specification for lithium concentrate and plan a processing licence under sections 70 to 72.
  8. Bring in an advocate for disputes. A refusal, cancellation, seizure, prosecution or legal opinion for a lender goes to an advocate.

Key dates

DateEvent
10 January 2018GN 1 (mineral rights) and GN 3 (local content) of 2018 published
28 August 2020Mining (Value Addition) Regulations, GN 687 of 2020, on TanzLII
1 July 2025HIV Response Levy of 0.1% in force (s.113A)
12 September 2025Local content amendments, GN 563 of 2025, published
27 April 2026Budget speech: Critical and Strategic Minerals Strategy finalised, list pending
1 July 2026Export tax on quartz and feldspar in force (F0339)
20 November 2026Raw mineral export ban reaffirmed at TMIC 2026
Grant + 3 monthsProspecting must start (s.46(1))
Grant + 18 monthsMining must start under an ML or SML (ss.57, 62)

How Zatra helps

Zatra structures the licence-holding company, prepares prospecting and mining licence files on the cadastre, and drafts local content, procurement and CSR plans. We coordinate the NEMC file and model royalty, State equity and the processing route. See our sector business permits service, our foreign investor setup service and our investment due diligence service for buyers of existing licences.

Government fees are paid at the official rate against each authority's control number and are never folded into Zatra's professional fee. Court or tribunal work, a formal legal opinion, a seizure or a prosecution goes to an advocate, on our team or the client's own. Zatra does not decide or guarantee any authority's outcome.

Sources and status

Accurate as at 22 November 2026.

Figures to confirm before you act

This article is general information based on official sources available at the date of publication. It is not legal, tax or financial advice. Laws and notices change. Verify with the issuing authority or consult Zatra before acting.

Frequently asked questions

Can a foreign company hold a lithium prospecting licence?

Yes. A prospecting licence carries no citizenship condition beyond the general eligibility tests in section 9. Most foreign explorers hold it through a Tanzanian subsidiary, because the later mining licence application needs a Tanzanian company with a TIN and a tax clearance certificate.

Can a foreigner mine lithium under a primary mining licence?

No. Section 9(2) reserves the PML to citizens and to bodies wholly owned, directed and controlled by citizens. A foreign investor can work with a PML holder on documented terms, or support conversion of PMLs into a mining licence in which it can hold shares.

Does the critical minerals strategy give lithium tax incentives?

Not yet. The strategy takes effect only once the official list is approved, and we found no gazetted incentive for lithium. Incentives today come from the general tax laws, TISEZA certificates or a framework agreement negotiated for a specific project.

Can lithium drill samples be sent abroad for assay?

Samples and core leave the Mainland only with the Commission's approval. Agree the sample size, the laboratory and the paperwork before shipping. Keep the approval with the export documents, because customs and the Commission will ask for it.

Is a lithium hydroxide plant a mineral right?

No. A plant that turns concentrate into chemicals needs a processing, smelting or refining licence under sections 70 to 72, plus its own EIA certificate. It can be held by a different company from the mine, but expect the Government to seek terms in any framework agreement.

Who pays royalty when a dealer exports lithium bought from miners?

A licensed dealer that exports minerals it did not mine makes a payment in lieu of royalty at the same rate, unless the seller already paid royalty. The dealer company must be at least 25% Tanzanian-held, and each export needs a Commission permit.

How long does a lithium mining licence last?

A mining licence runs for the term requested, up to ten years, and is renewable. A special mining licence can run for the life of the ore body. Mining must start within eighteen months of grant under either licence.

Sources & regulators

Verify before filing: Rates, forms and thresholds move by Finance Act, Government Notice and portal revision. Confirm the live schedule on the mandate-holder portal before you budget or submit. Law-firm alerts and Big Four notes are discovery only.

Brief the desk

This Insights page is orientation. Sector Business Permits in Tanzania is the commercial desk for the same facts. Zatra’s fee stays on its own line, separate from government, bank and regulator charges. Approvals are not guaranteed.

Book a 20-minute file check Talk to Zatra

+255 747 912 965 · [email protected] · WhatsApp +255 747 912 965

Disclaimer

This article is informational orientation. It is not legal, tax or investment advice and not a government decision. Tanzanian instruments move by Act, Government Notice, Finance Act and portal revision. If a sentence here disagrees with the live mandate-holder, the mandate-holder wins. Zatra Consultants Limited does not issue licences, permits, tax clearances or approvals, and gives no assurance of any regulatory or banking outcome. Professional fees are published only on /pricing/.

Office Line +255 747 912 965
Ask Senior Desk on WhatsApp