What does iron ore mining in Tanzania require? On the Mainland, a Mining Commission licence under the Mining Act, Cap. 123 R.E. 2023, sized to capital: a prospecting licence, then a mining licence or a special mining licence. Iron is a metallic mineral, so royalty is 6% of gross value, plus a 1% inspection fee and a 0.1% levy. Processing in Tanzania is expected before export.
Iron ore mining in Tanzania is moving from plans to construction. The Government expects its flagship Liganga iron ore and Mchuchuma coal project to finish construction by July 2030, and a smaller iron project at Maganga Matitu has entered its build phase.
This guide sets out the legal route for an iron ore project on the Mainland under the Mining Act, Cap. 123 R.E. 2023, with the Liganga status and the position in Zanzibar.
What the law says about iron ore
The parent law is the Mining Act, Cap. 123 R.E. 2023, in the Office of the Solicitor General e-Library. Section 2 applies it to Mainland Tanzania. We read the official R.E. 2023 PDF on 23 November 2026 up to Part V, and its arrangement of sections in full.
The core rules for iron ore sit in five places:
- section 4, which defines the mineral classes and the capital bands for each licence;
- sections 38 to 72, which cover prospecting, mining, special mining, primary mining and processing licences;
- section 111 on royalty and section 115 on the inspection fee;
- sections 126 to 129, headed storage of raw minerals, sorting and valuation, control over removal of raw minerals, and handling of mineral concentrates;
- Part XI, sections 150 to 152, on disputes.
Supporting instruments. The Mining (Mineral Rights) Regulations, 2018, GN 1 of 2018 set forms, areas, fees and rent. The Mining (Mineral Beneficiation) Regulations, 2018, GN 5 of 2018, govern processing, smelting and refining licences. The Natural Wealth and Resources (Permanent Sovereignty) Act, 2017, Cap. 449 sets the policy that raw resources are not exported for beneficiation abroad.
Many articles still cite the TanzLII text as at 30 November 2019. Its numbering differs. Royalty was section 87 there and is section 111 in R.E. 2023.
Who should read this
- Foreign and local investors weighing an iron ore prospect, or a stake in one.
- Steel, roofing-sheet and rebar makers that want local ore instead of imported billets or scrap.
- Contractors and suppliers bidding into Liganga, Maganga Matitu or a new plant.
- Lenders and buyers running due diligence on a company that holds an iron ore licence.
Is iron ore a metallic mineral under the Mining Act?
Yes. Section 4 of R.E. 2023 defines "metallic minerals" as "a group of minerals comprising of gold, silver, copper, iron", followed by nickel, cobalt, tin, tungsten and other named metals. The 2019 TanzLII text carries the same definition.
That classification sets the royalty class, the mining licence rent band and the prospecting minimum spend. Iron ore pays the metallic rate in each case.
Liganga ore also carries titanium and vanadium, which the developer plans to recover as separate concentrates. Titanium is a named metallic mineral in section 4. We did not confirm how vanadium is classed, so ask the Commission before you model a by-product.
Which licence does an iron ore project need?
The licence follows the stage of work and the capital invested. The bands below come from the section 4 definitions in R.E. 2023. Fees come from Zatra's government fee register at 26 September 2026, with each line ID.
| Licence | Purpose and capital band | Who may hold it | Main government fees (register ID) |
|---|---|---|---|
| Prospecting licence (PL) | Exploration only | Any qualified applicant; foreign ownership allowed | Application USD 300; preparation USD 300; rent from USD 100 a km2 a year (F0615, F0616) |
| Primary mining licence (PML) | Small-scale mining; capital not above USD 5 million | Citizens and citizen-owned bodies only (s.9(2)) | Application TZS 50,000; rent TZS 45,000 a hectare for other minerals (F0619, F0620) |
| Mining licence (ML) | Medium scale; capital USD 100,000 to USD 100 million | Tanzanian company; foreign shareholders allowed | Application USD 2,000; preparation USD 1,000; rent USD 3,000 a km2 for metallic minerals (F0621) |
| Special mining licence (SML) | Large scale; capital of USD 100 million or more | As for ML; grant after Cabinet approval (s.52) | Application USD 5,000; preparation USD 2,000; rent USD 5,000 a km2 (F0621) |
| Smelting licence | Turning ore or concentrate into iron or steel | Any qualified company | Application TZS 150,000 (USD 200) (F0631) |
Prospecting. Section 38(3) requires the application to state the mineral and area, technical and financial resources, a procurement plan, an integrity pledge and a local content plan. Our prospecting licence guide covers terms and renewals.
Mining. An ML application needs a feasibility study, a requested term of up to ten years, a TIN and a TRA tax clearance certificate. Our mining licence guide walks through the file.
Special mining. An integrated mine and steel plant usually costs far more than USD 100 million. Under section 52 the Commission sends the application to the Minister and grants it "upon approval by the Cabinet".
Applications run through the Online Mining Cadastre Transactional Portal, and the Mining Commission decides them. Our Mining Cadastre guide explains accounts, coordinates and GePG payments.
What does an iron ore prospecting licence cost to keep?
Iron ore sits in the general rent and spending scale, not the lower industrial scale.
- Rent: USD 100 a km2 a year in the initial period, USD 150 on first renewal and USD 200 on second renewal (F0616).
- Minimum spending: USD 500, USD 2,000 and USD 6,000 a km2 a year across the same periods (F0618).
- Renewal application: USD 300 (F0617).
A 50 km2 iron ore PL therefore costs USD 5,000 a year in rent and commits at least USD 25,000 a year of work in its first period.
Section 46(1) requires prospecting to start within three months of grant. A holder that misses its programme or minimum spend is in default. Our idle mining licences guide explains the notice and cancellation sequence, which the Government has promised to apply.
What royalty and fees apply to iron ore?
Royalty is charged on gross value under section 111 of R.E. 2023. The 2019 text, section 87(1)(c), charges "metallic minerals such as copper, gold, silver, and platinum group minerals" at six per centum. Zatra's fee register prints the same 6% metallic class under section 111(1) (F0624).
Iron is not in the "such as" list, but it is a metallic mineral by definition in section 4. The 6% rate therefore applies to iron ore and iron ore concentrate. We read section 111 by heading only in the R.E. 2023 PDF, so the rate is marked for confirmation below.
| Charge | Rate or amount | When it falls | Register ID | Basis |
|---|---|---|---|---|
| Royalty, metallic minerals | 6% of gross value | On minerals sold, disposed of or removed | F0624 | Cap. 123 R.E. 2023 s.111(1) |
| Inspection fee | 1% of gross value | Before clearance for export or domestic use | F0625 | Cap. 123 R.E. 2023 s.115 |
| HIV Response Levy | 0.1% of gross value | Paid with royalty, from 1 July 2025 | F0626 | Cap. 123 s.113A, Finance Act 2025 |
| Export permit application | USD 100 | Each export permit | F0628 | GN 2 of 2018 as amended |
| Service levy | 0.25% of turnover | To the district council | F0630 | Local Government Finance Act, Cap. 290 |
The Finance Act, 2025 added the 0.1% levy as section 113A. Income tax, withholding taxes and VAT sit on top and are outside this guide. Our royalty and inspection fee guide explains gross value, payment timing and the 2026 review of mineral charges.
Can iron ore be exported raw from Tanzania?
Plan on processing in Tanzania. Export of unprocessed ore faces policy and legal barriers, and any lawful export needs a Commission permit.
The Permanent Sovereignty Act. Section 9(1) of Cap. 449 requires arrangements that ensure "no raw resources are exported for beneficiation outside the United Republic". Section 9(2) requires a commitment to build beneficiation facilities in the country.
The Mining Act. Section 20 of R.E. 2023 is headed "Restriction on exportation or domestic use of minerals". It bars removing minerals from a mine for export or domestic use without the required clearance. Section 69 requires holders to set aside minerals "for processing, smelting or refining within the United Republic". Sections 126 to 129 deal with raw minerals and concentrates; we read those by heading only.
The 2026 policy line. The Chanzo reported on 20 November 2026 that Minerals Minister Anthony Mavunde opened the Tanzania Mining and Investment Conference with a clear line. He said: "Not a single stone will leave the country unprocessed, unrefined or unpolished." The report says he cited section 100D, a pre-revision section number.
An honest caveat. The 2017 ban on metallic concentrate exports was an administrative measure. The IEA policy database records it as removed in 2020 after agreement with mining companies. Concentrate exports have since moved under permit for some minerals. We found no published rule that sets a minimum iron grade for export.
In practice, assume a local buyer or your own beneficiation plant. Our mineral value addition guide, processing licence guide and mineral export permit guide cover each step.
What is the status of the Liganga and Mchuchuma projects?
Liganga is the country's flagship iron ore deposit, in Ludewa District, Njombe Region. It is developed together with the Mchuchuma coal deposit, which would supply power and coal.
What the state partner says. The National Development Corporation's iron and steel page gives these facts:
- reserves of 126 million tonnes of iron ore, from 2013 drilling over 10 km2;
- a joint venture company, Tanzania China International Mineral Resources Limited (TCIMRL), held 20% by NDC (non-cash) and 80% by Sichuan Hongda Group;
- ESIA certificates, a mining licence and a water right on the Lupali River already obtained;
- planned output of 1.0 million tonnes a year of steel products, expandable to 2 million, plus titanium and vanadium concentrates;
- an estimated USD 1.623 billion for the mine, infrastructure and steel plant.
The page is undated and still names Sichuan Hongda, so treat it as NDC's last published position.
The change of investor. TanzaniaInvest reported on 30 May 2026 that Shudao Investment Group (SDIG), a Chinese state-owned group, acquired the project from Sichuan Hongda. The report says the Government had concluded negotiations with SDIG. It also says joint venture and shareholders agreements were expected in the first half of 2026/27.
The latest timetable. The Chanzo reported on 17 November 2026 that Industry and Trade Minister Judith Kapinga met SDIG in Chengdu. The parties set July 2030 as the target to complete construction. Project agreements are now expected in the third quarter of 2026/27, and the start of construction was not announced.
| Date | Liganga and Mchuchuma event | Source |
|---|---|---|
| 2011 | Joint venture agreed with Sichuan Hongda | The Chanzo, 17 Nov 2026 |
| 2013 | Drilling puts Liganga at 126 million tonnes | NDC |
| 2024 | SDIG acquires Sichuan Hongda's interest | The Chanzo; TanzaniaInvest |
| 22 May 2026 | Budget speech: talks with SDIG concluded | TanzaniaInvest, 30 May 2026 |
| Early October 2026 | Preliminary feasibility reports received | The Chanzo, 17 Nov 2026 |
| Q3 of 2026/27 | Project agreements expected to be signed | The Chanzo, 17 Nov 2026 |
| July 2030 | Target to complete construction | The Chanzo, 17 Nov 2026 |
Signing dates have slipped many times since 2011. Our coal mining guide covers the Mchuchuma side and the coal royalty rules.
Maganga Matitu. Xinhua reported on 4 August 2024 that NDC signed a USD 77.4 million project with Fujian Hexingwang Industrial Co. Ltd to produce sponge iron. The site covers 19.63 km2 and is part of the Liganga area. The Citizen reported on 1 September 2026 that the project had entered construction after mining equipment arrived.
Is there local demand for Tanzanian iron ore?
Yes, but most of it is not met from local ore yet. TanzaniaInvest reported on 19 June 2026 on official figures for the steel sector:
- 19 major steel and roofing-sheet makers, with about 1.2 million tonnes a year of capacity;
- domestic demand of about 600,000 tonnes a year;
- most makers using imported billets, imported feedstock or recycled scrap.
The same report covers A1 Iron & Steel Tanzania Ltd. It plans a blast furnace plant at Nala, Dodoma, costing more than TZS 600 billion and using locally sourced iron ore. Construction was due to start in July 2026 and take 15 months.
For a small or mid-sized iron ore licence, that demand is the business case. A domestic sale avoids the export question but still pays royalty and inspection fee.
What stake does the Government take, and what local content applies?
Free carried interest. Section 11(1) of R.E. 2023 gives the Government "not less than sixteen percent non-dilutable free carried interest shares" in a company holding an ML or SML. Section 11(2) lets it acquire "in total, up to fifty percent of the shares", linked to tax expenditures. At Liganga, NDC's 20% stake shows the floor can be exceeded by agreement. See our free carried interest guide.
Local content. Section 133 is headed "Provision of goods and services by Tanzanian entrepreneurs". Every PL, ML and SML application carries a local content plan under the Mining (Local Content) Regulations, GN 3 of 2018. Clyde & Co reported on 18 September 2025 that GN 563 of 2025 tightened them:
- a non-indigenous supplier must form a joint venture with a company wholly owned by Tanzanian citizens;
- the indigenous partner needs at least 20% equity, unless the item is on the exclusive list;
- the Commission keeps a list of goods and services reserved for wholly Tanzanian-owned firms.
Our local content ownership checks set out what the Commission tests.
Do you need an EIA for an iron ore mine?
Yes. The Environmental Management Act, Cap. 191 applies to Mainland Tanzania, and section 81 imposes the obligation to undertake an Environmental Impact Assessment. The National Environment Management Council (NEMC) registers and reviews the study. For an SML, section 51(3)(e) of the Mining Act makes the environmental certificate part of the application itself.
Review fees depend on project cost (F0498). An open pit with a beneficiation plant is likely to fall in the top bands:
- TZS 50,000,000 for a Type A extractive project costing TZS 50 billion to 499.99 billion;
- TZS 100,000,000 at TZS 500 billion and above;
- TZS 4,500,000 a year for major mining works after approval (F0505).
A blast furnace or direct-reduction plant needs its own certificate. Our EIA guide explains registration, scoping and review.
Worked example: royalty and inspection fee on a USD 2 million iron ore concentrate shipment
Example: a Tanzanian company holds a mining licence over 6 km2 and runs a magnetic separation plant. It sells 20,000 tonnes of iron ore concentrate at an illustrative USD 100 a tonne. The gross value of the shipment is USD 2,000,000. Prices are for illustration only, not a forecast.
| Charge | Working | USD | TZS at an assumed 2,500 |
|---|---|---|---|
| Royalty, 6% (F0624) | 2,000,000 x 6% | 120,000 | 300,000,000 |
| Inspection fee, 1% (F0625) | 2,000,000 x 1% | 20,000 | 50,000,000 |
| HIV Response Levy, 0.1% (F0626) | 2,000,000 x 0.1% | 2,000 | 5,000,000 |
| Total on gross value | 120,000 + 20,000 + 2,000 | 142,000 | 355,000,000 |
| Service levy, 0.25% (F0630) | 2,000,000 x 0.25% | 5,000 | 12,500,000 |
The mineral charges take 7.1% of gross value, or USD 142,000. With the service levy, government charges reach USD 147,000 before income tax. An export would add a USD 100 permit application fee (F0628).
Annual rent. At the metallic rate, 6 km2 x USD 3,000 is USD 18,000 a year (F0621). The project sits under the USD 100 million SML threshold, so no Cabinet step applies.
Government charges are paid to each authority against its own control number at the official rate. Zatra's professional fee is quoted and invoiced separately.
How do Mainland and Zanzibar differ?
Mining is not a Union matter. Section 2 of the Mining Act limits it to Mainland Tanzania, and Cap. 191 does the same for the Mainland environmental regime. Cap. 449 applies to both sides of the Union, without prejudice to Zanzibar's authority over its own resources.
| Point | Mainland | Zanzibar |
|---|---|---|
| Mining law | Mining Act, Cap. 123 R.E. 2023 | No dedicated mining law reported in November 2024; later enactment not confirmed |
| Licensing body | Mining Commission, through the online cadastre | Not confirmed |
| Royalty and inspection fee | s.111 and s.115 (F0624, F0625) | Unknown |
| Environmental approval | NEMC process under Cap. 191 | Zanzibar Environmental Management Act, 2015 |
| Known iron ore deposits | Liganga and Maganga Matitu, Njombe Region | None found |
The Citizen reported on 28 November 2024 that Zanzibar had no dedicated mining law and was preparing one. We could not confirm its enactment. Shipping Mainland ore through a Zanzibar port does not remove the need for a Mining Commission permit.
How are iron ore disputes resolved?
Licence disputes. Part XI of the Mining Act is headed "Disputes settlement". Section 150 is headed "Commission may decide disputes", section 151 covers enforcement of its orders, and section 152 provides an "Appeal to High Court". Boundary clashes and claims between holders usually start there.
Investor and State disputes. Section 11 of Cap. 449 required disputes over natural resources to be decided in Tanzania under Tanzanian law. LEX Africa reported on 16 October 2026 that the Written Laws (Miscellaneous Amendments) (No. 2) Act, 2026 added section 11(4). An agreement approved by the Cabinet may now set its own forum, including a foreign arbitration seat.
Without Cabinet approval, local adjudication remains the default. Our natural resources arbitration guide sets out the new route.
A refusal, cancellation, seizure, prosecution or appeal to the High Court goes to an advocate. So does any legal opinion a lender will rely on.
What to do now
- Check the ground. Search the cadastre for overlapping licences and for any area reserved around Liganga before you plot coordinates.
- Set up the holding company. Incorporate in Tanzania with a TIN and directors who meet section 9. Model the 16% free carried interest from the start.
- File a complete PL application. Include the work programme, procurement plan, local content plan and integrity pledge required by section 38(3).
- Start work within three months. Meet the programme and the USD 500 a km2 minimum spend, and pay rent each year.
- Find the buyer before the mine. Agree offtake with a Tanzanian steel plant, or plan your own smelting licence under section 72.
- Ask for the export position in writing. If any export is planned, obtain the Commission's view on grade and permits before design freeze.
- Open the NEMC file early. Register the EIA well before an ML or SML application, and budget the review fee by project cost.
- Route disputes to an advocate. Refusals, cancellations, seizures, prosecutions and lender opinions need an advocate on record.
Key dates
| Date | Event |
|---|---|
| 5 July 2017 | Permanent Sovereignty Act assented: s.9 on raw resources, s.11 on local forum |
| 10 January 2018 | GN 1 (mineral rights), GN 3 (local content) and GN 5 (beneficiation) of 2018 published |
| 1 July 2025 | HIV Response Levy of 0.1% in force (s.113A) |
| 12 September 2025 | Local content amendments, GN 563 of 2025, published |
| 2 October 2026 | No. 2 Act, 2026 gazetted, adding s.11(4) to Cap. 449, as reported |
| 20 November 2026 | Raw mineral export ban reaffirmed at TMIC 2026 |
| Grant + 3 months | Prospecting must start (s.46(1)) |
How Zatra helps
Zatra structures the licence-holding company, prepares PL, ML and processing licence files on the cadastre, and drafts local content and procurement plans. We coordinate the NEMC file, model royalty and State equity, and map offtake to steel buyers. See our sector business permits service, our foreign investor setup service and our investment due diligence service for buyers of an existing licence.
Government fees are paid at the official rate against each authority's control number and are never folded into Zatra's professional fee. Court or tribunal work, a formal legal opinion, a seizure or a prosecution goes to an advocate, on our team or the client's own. Zatra does not decide or guarantee any authority's outcome.
Sources and status
Accurate as at 23 November 2026.
- Mining Act, Cap. 123 R.E. 2023. Office of the Solicitor General e-Library, item dated 1 July 2025. Accessed 23 Nov 2026.
- Mining Act, Cap. 123 R.E. 2023, official PDF. Government Printer via OSG, 2023. Accessed 23 Nov 2026.
- Mining Act, Cap. 123, text as at 30 November 2019. TanzLII, 30 November 2019. Accessed 23 Nov 2026.
- Mining (Mineral Rights) Regulations, 2018, GN 1 of 2018. TanzLII, 10 January 2018. Accessed 23 Nov 2026.
- Natural Wealth and Resources (Permanent Sovereignty) Act, 2017. TanzLII, Act No. 5 of 2017. Accessed 23 Nov 2026.
- Environmental Management Act, 2004 (Cap. 191). TanzLII, text as at 31 December 2004. Accessed 23 Nov 2026.
- Finance Act, 2025, Act No. 11 of 2025. Tanzania Revenue Authority, June 2025. Accessed 23 Nov 2026.
- Iron and Steel: Liganga project. National Development Corporation, undated page, live 2026. Accessed 23 Nov 2026.
- Tanzania, Chinese investor set July 2030 deadline for Mchuchuma, Liganga projects. The Chanzo, 17 November 2026. Accessed 23 Nov 2026.
- Tanzania reaffirms ban on raw mineral exports. The Chanzo, 20 November 2026. Accessed 23 Nov 2026.
- Industry and Trade budget 2026/27. TanzaniaInvest, 30 May 2026. Accessed 23 Nov 2026.
- TZS 600 billion steel plant using local iron ore to be developed in Dodoma. TanzaniaInvest, 19 June 2026. Accessed 23 Nov 2026.
- Tanzania, Chinese firm sign 77-mln-USD iron ore mining project. Xinhua, 4 August 2024. Accessed 23 Nov 2026.
- Report on the USD 77 million Maganga Matitu iron mining project. The Citizen, 1 September 2026. Accessed 23 Nov 2026.
- Ban on the export of unrefined metals in Tanzania. International Energy Agency, updated 22 September 2025. Accessed 23 Nov 2026.
- Amendment to the Mining Local Content Regulations. Clyde & Co, 18 September 2025. Accessed 23 Nov 2026.
- New flexibility for natural resource disputes in Tanzania. LEX Africa, 16 October 2026. Accessed 23 Nov 2026.
- How Zanzibar hopes to promote economic growth with mining law. The Citizen, 28 November 2024. Accessed 23 Nov 2026.
- Zatra government fee register, lines F0495, F0498, F0505, F0615 to F0621, F0624 to F0626, F0628, F0630, F0631. Zatra Consultants, fees at 26 September 2026. Accessed 23 Nov 2026.
Figures to confirm before you act
- The operative R.E. 2023 wording of section 111(1), read here by heading only; the 6% metallic rate comes from the 2019 text and the fee register.
- The royalty class the Commission applies to vanadium concentrate recovered from Liganga ore.
- The operative wording of sections 126 to 129 and any export grade rule for iron ore under the value addition regulations.
- The signed terms of the Liganga and Mchuchuma project agreements, including the final NDC and SDIG shareholding.
- Whether Zanzibar has passed a mining law since November 2024.
This article is general information based on official sources available at the date of publication. It is not legal, tax or financial advice. Laws and notices change. Verify with the issuing authority or consult Zatra before acting.
Frequently asked questions
Can a foreign investor hold an iron ore primary mining licence?
No. Section 9(2) reserves the PML to citizens and bodies wholly owned and controlled by citizens. A foreign investor can buy ore from PML holders on documented terms, or back conversion of their ground into a mining licence in which it can hold shares.
Does iron ore sold to a local steel plant still pay royalty?
Yes. Royalty falls on minerals sold or removed whatever the destination, and the inspection fee falls before clearance for domestic use as well as export. A local sale changes the export question, not the mineral charges. Set the valuation basis in the offtake contract.
Does a steel plant need a mining licence?
Not if it only buys ore or concentrate. A plant that smelts ore into iron or steel needs a smelting licence under section 72, its own EIA certificate and the usual business and factory registrations. It can be owned by a different company from the mine.
Can outsiders invest in the Liganga deposit itself?
Not directly. The deposit is held through TCIMRL, the NDC joint venture, and the investor is now SDIG. Outside companies are more likely to take part as contractors, suppliers or offtakers, subject to the local content rules on joint ventures with Tanzanian-owned firms.
Can iron ore samples be sent abroad for testing?
Samples and drill core leave the Mainland only with the Commission's approval. Agree the sample size, the laboratory and the paperwork before shipping, and keep the approval with the export documents. Customs and the Commission will ask for it at the border.
Can a shareholder sell a company that holds an iron ore licence?
A transfer of the licence itself needs Commission consent, and a change of control in the holding company has its own Commission and income tax consequences. Run due diligence on rent, spending and default notices first. Our licence transfer guide sets out the steps.
What happens to an iron ore licence that sits idle?
The Commission can issue a default notice and then cancel the licence if the holder fails to cure it. The Vice President warned at TMIC 2026 that the Government will act against holders who sit on licences. Keep work records and spending evidence current.
Sources & regulators
Verify before filing: Rates, forms and thresholds move by Finance Act, Government Notice and portal revision. Confirm the live schedule on the mandate-holder portal before you budget or submit. Law-firm alerts and Big Four notes are discovery only.
- Mining Act, Cap. 123 R.E. 2023: Office of the Solicitor General e-Library, R.E. 2023, item dated 1 July 2025. Accessed 2026-11-23.
- Mining Act, Cap. 123 R.E. 2023, official PDF: Government Printer via OSG e-Library, Revised Edition 2023. Accessed 2026-11-23.
- Mining Act, Cap. 123, text as at 30 November 2019: TanzLII, consolidated to 30 November 2019. Accessed 2026-11-23.
- Mining (Mineral Rights) Regulations, 2018, GN 1 of 2018: TanzLII, GN published 10 January 2018. Accessed 2026-11-23.
- Natural Wealth and Resources (Permanent Sovereignty) Act, 2017: TanzLII, Act No. 5 of 2017. Accessed 2026-11-23.
- Environmental Management Act, 2004 (Cap. 191): TanzLII, text as at 31 December 2004. Accessed 2026-11-23.
- Finance Act, 2025, Act No. 11 of 2025: Tanzania Revenue Authority, Act enacted June 2025. Accessed 2026-11-23.
- Iron and Steel: Liganga project: National Development Corporation, undated page, live November 2026. Accessed 2026-11-23.
- Online Mining Cadastre Transactional Portal: Ministry of Minerals, live 2026. Accessed 2026-11-23.
- Mining Commission official website: Tume ya Madini, live 2026. Accessed 2026-11-23.
- National Environment Management Council: NEMC, live 2026. Accessed 2026-11-23.
- Tanzania, Chinese investor set July 2030 deadline for Mchuchuma, Liganga projects: The Chanzo, 17 November 2026. Accessed 2026-11-23.
- Tanzania reaffirms ban on raw mineral exports, warns firms sitting on idle licences: The Chanzo, 20 November 2026. Accessed 2026-11-23.
- Industry and Trade budget 2026/27 funds Liganga-Mchuchuma: TanzaniaInvest, 30 May 2026. Accessed 2026-11-23.
- TZS 600 billion steel plant using local iron ore to be developed in Dodoma: TanzaniaInvest, 19 June 2026. Accessed 2026-11-23.
- Tanzania, Chinese firm sign 77-mln-USD iron ore mining project: Xinhua, 4 August 2024. Accessed 2026-11-23.
- Report on the USD 77 million Maganga Matitu iron mining project: The Citizen, 1 September 2026. Accessed 2026-11-23.
- Ban on the export of unrefined metals in Tanzania: International Energy Agency policy database, updated 22 September 2025. Accessed 2026-11-23.
- Amendment to the Mining Local Content Regulations: Clyde & Co, 18 September 2025. Accessed 2026-11-23.
- New flexibility for natural resource disputes in Tanzania: LEX Africa, 16 October 2026. Accessed 2026-11-23.
- How Zanzibar hopes to promote economic growth with mining law: The Citizen, 28 November 2024. Accessed 2026-11-23.
Disclaimer
This article is informational orientation. It is not legal, tax or investment advice and not a government decision. Tanzanian instruments move by Act, Government Notice, Finance Act and portal revision. If a sentence here disagrees with the live mandate-holder, the mandate-holder wins. Zatra Consultants Limited does not issue licences, permits, tax clearances or approvals, and gives no assurance of any regulatory or banking outcome. Professional fees are published only on /pricing/.