Helium Exploration Tanzania: Licences, Royalty and the State's Stake

Which law governs helium exploration in Tanzania? The Mining Act, Cap. 123. Helium is a gaseous mineral, not petroleum, so the Mining Commission grants the prospecting and mining licences. Tanzania's first helium mining licence, 480 km2 in southern Rukwa, went to Songwe Helium Ltd in July 2025, with the Government holding 17%. Petroleum law reaches helium only inside natural gas from a petroleum contract area.
Helium exploration in Tanzania is licensed under the Mining Act, not the petroleum law. The Rukwa, Eyasi and Balangida rift basins have held helium prospecting licences since at least 2017, and the first commercial licence was granted in 2025. Investors still ask the same three questions. Which law applies, what does the State take, and how far have the projects moved?
This guide answers them from the statutes and the companies' own filings, and covers Zanzibar separately.
What the law says about helium
Two definitions decide the question. Both are worth reading in full because they point in opposite directions for different kinds of gas.
The Mining Act. Section 4 of the Mining Act, Cap. 123, as published on TanzLII defines a "mineral" as "any substance, whether in solid, liquid or gaseous form, occurring naturally in or on the earth". The definition excludes "petroleum or surface water". Helium is a naturally occurring gas that is not a hydrocarbon. On the text, it is a mineral.
The Petroleum Act. Section 3 of the Petroleum Act, No. 21 of 2015 defines "petroleum" as naturally occurring hydrocarbons and mixtures of hydrocarbons. It defines "natural gas" as hydrocarbons in a gaseous state produced from the contract area, including "all non-hydrocarbon substances therein". So helium carried inside natural gas produced from a petroleum contract area is part of that natural gas.
The result is a clean split. Primary helium in rift basins, without commercial hydrocarbons, is a mineral. Helium recovered from natural gas under a production sharing agreement is petroleum.
What the regulators have done. Practice confirms the reading. The Mining Commission received and granted the southern Rukwa helium mining licence. The Ministry of Minerals approved its size. Rive & Co's legal analysis of 11 May 2026 places the project under the Mining Act, the Mining (State Participation) Regulations, 2022 and the local content rules.
What the Act does not say. Helium is not named anywhere in the Mining Act text we read. The Act defines "energy minerals" as "coal, peat, uranium, thorium and other radioactive minerals". Helium is not in that list. That affects rent and royalty, covered below.
Who should read this
- Exploration companies and their Tanzanian subsidiaries holding or applying for helium prospecting licences.
- Investors and farm-in partners pricing a helium project in the Rukwa, Eyasi or Balangida basins.
- Offtakers and lenders who need the fiscal stack before a final investment decision.
- Drilling contractors, camp operators and suppliers who must meet local content rules on a helium site.
Mining Act or Petroleum Act: which law governs helium?
Ask where the helium sits and what it is produced with. The table sets out the two routes.
| Point | Primary helium (rift basin) | Helium in produced natural gas |
|---|---|---|
| Statute | Mining Act, Cap. 123 | Petroleum Act, 2015 |
| Why | A gaseous "mineral", not a hydrocarbon | Part of "natural gas", which includes non-hydrocarbon substances |
| Licensing body | Mining Commission, under the Ministry of Minerals | PURA, with TPDC as the national oil company |
| Exploration right | Prospecting licence | Exploration licence and production sharing agreement |
| Production right | Mining licence or special mining licence | Development licence |
| State share | Free carried interest of at least 16% | TPDC participation under the agreement |
| Current examples | Songwe Helium, Noble Helium, Rift Helium | None confirmed in Tanzania |
Where a basin holds both helium and hydrocarbons, raise the overlap with both regulators before drilling. PURA publishes the petroleum statutes it administers, and our upstream petroleum guide explains the PURA and TPDC route.
Which licences do Helium One and Noble Helium hold?
Company filings are the best evidence of how the regulators treat helium. Every holder below operates under the Mining Act.
| Company | Project | Licence held | Status reported |
|---|---|---|---|
| Helium One Global, through Songwe Helium Ltd (83%) | Southern Rukwa | Mining licence, about 480 km2 | Awarded July 2025; framework and shareholders agreements signed 2 May 2026 |
| Helium One Global | Southern Rukwa (former PLs) | PL 11135/2017 and PL 11136/2017 | Expired 1 June 2025, replaced by the mining licence |
| Helium One Global | Central Eyasi | Prospecting licence, 286 km2 | Retained in September 2024; current status to confirm |
| Noble Helium | North Rukwa | Prospecting licences held by subsidiaries | Kinambo drilling planned in 2026 |
| Noble Helium | Eyasi and Manyara | Prospecting licence applications | Applications reported in 2022; current status to confirm |
| Rift Helium plc | Upepo, Rukwa Basin | Prospecting licences, about 283 km2 | EIA certificate for seismic and up to three wells, reported September 2026 |
Helium One. The company's company update of 17 September 2024 said it had applied to the Ministry of Minerals and the Mining Commission for a mining licence. TanzaniaInvest reported on 16 June 2025 that the licence would sit in Songwe Helium Ltd, with the Government holding a 17% free carried interest. Initial annual rent of about USD 960,000 had been paid.
Noble Helium. Its April 2026 investor presentation states that "the licenses issued to the Company's subsidiaries are prospecting licences". It also sets out the 16% free carried interest that a mining licence would bring.
How do you get a prospecting licence for helium?
A prospecting licence is a mineral right under Part IV of the Mining Act. The applicant files through the Mining Commission's online mining cadastre portal. Our prospecting licence guide covers the general route in detail. The helium-specific points are these.
The mineral group. The Mining (Mineral Rights) Regulations, 2018, GN 1 of 2018 set areas, rents and minimum spend by mineral group. Helium is not named in the energy minerals group of the Act. Ask the Commission in writing which group it applies to helium before you budget. The group drives the area cap and the spend obligation.
Term. The initial period runs up to four years. Two renewals of up to two years each follow, under section 42(1) of the Revised Edition 2023. Ground must be partly relinquished on renewal.
Fees. For the metallic and energy groups, application and preparation cost USD 300 each, and rent starts at USD 100 a km2 a year (F0615, F0616). Renewal costs USD 300 (F0617). The fee table below lists the full set.
The holder. A prospecting licence may be held by a foreign-owned company. Explorers usually hold through a Tanzanian subsidiary, because a mining licence later needs a local company. Our foreign investor setup service builds that structure first.
How does a helium project move to a mining licence?
The mining licence is the medium-scale production right. Section 4 of the Act ties it to capital investment between USD 100,000 and USD 100,000,000. Above that, a special mining licence applies. Our mining licence guide sets out the classes, rents and documents.
The southern Rukwa file shows the sequence in practice:
- Application with a feasibility study, September 2024.
- NEMC review and an environmental impact certificate.
- Offer letter from the Mining Commission, reported on 4 March 2025.
- Acceptance and first year's fee paid, 31 March 2025.
- Formal award to Songwe Helium Ltd in July 2025.
- Framework and shareholders agreements signed, 2 May 2026.
Area. The regulations cap a mining licence at 10 km2 for most mineral groups. The southern Rukwa licence covers about 480 km2. TanzaniaInvest reported on 4 March 2025 that the Ministry of Minerals approved a licence larger than standard. Expect to justify area on reservoir grounds.
Timing. Award took about ten months from application, and the agreements about ten more.
What royalty applies to helium?
Royalty is charged on the gross value of minerals under section 111 of the Mining Act, Cap. 123 R.E. 2023 (section 87 in the 2019 text). The rates in the TanzLII text are:
- uranium, 5%;
- gemstones and diamonds, 6%;
- metallic minerals such as copper, gold, silver and platinum group minerals, 6%;
- gem (cut and polished), 1%;
- "other minerals, including building materials, salt" and industrial minerals, 3%.
Helium is not a metallic mineral, a gemstone or uranium. On the text, it falls in "other minerals" at 3% (register line F0624). We found no Finance Act or Government Notice that sets a separate helium rate. The southern Rukwa framework agreement is not published, so we cannot confirm the rate it applies. Treat 3% as Zatra's reading and confirm it with the Commission.
The independent evidence points the same way. MST Access's research note of 24 August 2023 modelled Tanzanian helium on "a 16% carry, 4% royalty +export levy, and 30% corporate tax". A 3% royalty plus the 1% inspection fee gives that 4%.
| Charge | Rate | Basis | Register ID |
|---|---|---|---|
| Royalty, "other minerals" | 3% of gross value | Cap. 123 R.E. 2023 s.111 | F0624 |
| Inspection fee | 1% of gross value | Cap. 123 R.E. 2023 s.115 | F0625 |
| HIV Response Levy | 0.1% of gross value | Cap. 123 s.113A, Finance Act 2025 | F0626 |
| Service levy | 0.25% of turnover | Local Government Finance Act Cap. 290 | F0630 |
| Corporate income tax | 30% | Income Tax Act Cap. 332 | F0196 |
| Withholding on technical services to mining | 10% resident; 15% non-resident | Cap. 332 s.106(1)(a) | F0213 |
See our royalty guide and mining tax guide.
Free carried interest: 16% in law, 17% at Songwe
Section 11 of the Mining Act R.E. 2023 gives the Government not less than 16% non-dilutable free carried interest in any company holding a mining licence or special mining licence. The Mining (State Participation) Regulations, GN 574 of 2022 set the mechanics: a framework agreement, Class B shares held by the Government Shareholder, a preferred dividend and loan notes on interest-bearing shareholder loans.
A prospecting licence carries no free carried interest. The stake attaches at the mining licence, which is why Songwe Helium Ltd holds the southern Rukwa licence.
The Government holds 17% of Songwe Helium Ltd, one point above the statutory floor. TanzaniaInvest called the whole 17% a free carried interest. Rive & Co described it as negotiated. The board has five members, three appointed by the company and two by the Government. Our free carried interest guide explains dilution, dividends and BRELA filings.
Local content and corporate social responsibility
A helium project is a mining project for local content purposes. The Mining (Local Content) Regulations, GN 3 of 2018, as amended, apply to every holder of a mineral right and to its contractors and subcontractors.
- A local content plan is filed with the Mining Commission and reported on.
- Goods and services available in Tanzania are bought locally. Reserved items go to wholly Tanzanian-owned firms.
- Since GN 563 of 2025, a foreign supplier's Tanzanian joint venture partner must be 100% citizen-owned and hold at least 20%.
Rive & Co notes that security, catering and local logistics are among the categories reserved for Tanzanian firms. On a remote rift basin drilling site, those are most of the support contracts. Our local content ownership checks cover the October 2026 enforcement push.
The mining licence also carries a corporate social responsibility plan agreed with the district council.
What does the environmental certificate cover for helium?
Exploration drilling and production both need an environmental impact certificate under the Environmental Management Act, Cap. 191. The National Environment Management Council registers the project, screens it and reviews the impact statement. The certificate itself is issued on NEMC's recommendation. Our guide on who issues the EIA certificate explains that split.
The certificate is scoped to the activity. Rift Helium's certificate, reported by Pan African Visions on 2 September 2026, covers a 3D seismic survey and up to three exploration wells. A production plant, pipeline or liquefaction unit needs its own assessment.
NEMC fees under GN 387 of 2021, as amended, include these lines:
- EIA application TZS 50,000; project brief or scoping report TZS 150,000 (F0495).
- Review of a Type A extractive project, by project cost: from TZS 5,000,000 below TZS 1 billion to TZS 100,000,000 at TZS 500 billion and above (F0498).
- Annual compliance fee for CO2 and helium extraction: TZS 10,000,000 (F0508).
Line F0508 also lists a separate annual fee for a mineral exploration or prospecting licence. Ask NEMC in writing which line it applies to a helium prospecting licence.
Can helium be exported, and what does it cost?
Yes. Helium produced under a mining licence is a mineral, so the mineral export rules apply. The holder needs a mineral export permit from the Mining Commission, and the 1% inspection fee is paid before clearance for export or domestic use. The export permit application costs USD 100 (F0628). Our mineral export permit guide covers the documents.
Helium is usually moved as a liquid in cryogenic containers or as compressed gas in tube trailers. Rukwa projects would reach the coast by road or rail to Dar es Salaam, the route Noble Helium's early materials cite. Customs and dangerous goods transport rules apply on top of the Mining Act.
The Government's push for value addition may shape helium sales. The 2026/27 budget lists helium among the targets of the Critical and Strategic Minerals Strategy, which TanzaniaInvest reported on 28 April 2026 takes effect once the official list is approved. Our value addition guide follows that strategy.
Rukwa, Balangida and Eyasi: project status in 2026
All status points below come from company announcements or the press. None is a regulator's statement.
Southern Rukwa (Helium One, Songwe Helium Ltd). TanzaniaInvest reported on 7 May 2026 that the framework and shareholders agreements were signed on 2 May 2026 in Songwe. Helium One's annual results of 13 November 2026 say a farm-out process began in May 2026, with talks ongoing. A 20-day pump test at Itumbula West-1 sustained 5.4% helium, air corrected. ChemAnalyst reported on 22 May 2026 a production target of November 2027. We could not confirm that date in a company filing.
North Rukwa (Noble Helium). TanzaniaInvest reported on 11 August 2026 that the company raised AUD 12 million and contracted a rig for two Kinambo wells, with mobilisation expected in August 2026. Later market reports say the plan changed to one deeper well. Check the company's ASX announcements for the spud and results.
Upepo (Rift Helium). Seismic is planned for late 2026 and drilling for the first half of 2027.
Balangida and Eyasi. Helium One's September 2024 update says its Balangida licence, 134 km2, expired after partial relinquishment. Two eastern Eyasi licences of 521 km2 reached the end of their final renewal and lapsed. The company kept one central Eyasi licence of 286 km2. Noble Helium reported Eyasi and Manyara applications in 2022. We found no 2026 drilling report for either basin.
Policy. ChemAnalyst reported that the Minister for Minerals announced helium would be designated a critical and strategic mineral. We found no gazetted list.
Mainland and Zanzibar: what applies where?
Section 2 of the Mining Act says it "shall apply to Tanzania Mainland". The prospecting licence, the mining licence, the free carried interest and the Mining Commission therefore stop at the coast.
| Point | Mainland | Zanzibar |
|---|---|---|
| Primary helium as a mineral | Mining Act, Cap. 123; Mining Commission | Mining Act does not apply. The Citizen reported in November 2024 that a Zanzibar mining law was proposed, not enacted. Current status unknown |
| Helium within natural gas | Petroleum Act, 2015; PURA and TPDC | Petroleum Act s.2(2)(b) leaves Zanzibar operations to Zanzibar's laws: the Oil and Gas (Upstream) Act, 2016 and ZPRA |
| Environmental approval | Environmental Management Act, Cap. 191; NEMC | Zanzibar's own environmental law, 2015, under its own authority |
| Company registry | BRELA | Zanzibar Business and Property Registration Agency |
| Known helium projects | Rukwa, Eyasi and Balangida basins | None found |
The Chanzo explained on 17 August 2022 how Zanzibar took its own route on oil and gas. Take any helium interest there to the Revolutionary Government of Zanzibar for a written position first.
Worked example: a 480 km2 helium mining licence
The figures below use the southern Rukwa licence area and register fees. Production value, profit and the exchange rate are illustrative assumptions, not company figures.
| Item | Calculation | Result |
|---|---|---|
| Annual rent at the building and industrial rate | 480 km2 × USD 2,000 (F0621) | USD 960,000 |
| Annual rent if charged at the energy mineral rate | 480 km2 × USD 3,000 (F0621) | USD 1,440,000 |
| Assumed gross value of helium sold | Illustrative | USD 25,000,000 |
| Royalty at 3% | USD 25,000,000 × 3% (F0624) | USD 750,000 |
| Inspection fee at 1% | USD 25,000,000 × 1% (F0625) | USD 250,000 |
| HIV Response Levy at 0.1% | USD 25,000,000 × 0.1% (F0626) | USD 25,000 |
| Service levy at 0.25% of turnover | USD 25,000,000 × 0.25% (F0630) | USD 62,500 |
| Charges on value and area, before income tax | Sum of rent at USD 2,000 and the four levies | USD 2,047,500 |
| NEMC annual compliance fee | CO2 and helium extraction (F0508) | TZS 10,000,000 |
| Assumed distributable profit | Illustrative | USD 8,000,000 |
| Government's 17% dividend, paid first | USD 8,000,000 × 17% | USD 1,360,000 |
| Balance to the private 83% | USD 8,000,000 less USD 1,360,000 | USD 6,640,000 |
| Dividend withholding on a non-resident parent | USD 6,640,000 × 10% (F0207) | USD 664,000 |
The reported rent of about USD 960,000 matches 480 km2 at USD 2,000. That is the band for building and industrial minerals, not the USD 3,000 energy band. It supports the reading that helium sits outside the energy minerals group. Confirm the band on the control number.
For example, an EIA review for a USD 60 million plant, at an assumed TZS 2,500 to the US dollar, is a project cost of TZS 150 billion. That falls in the TZS 50 billion to TZS 499.99 billion band, so the review fee is TZS 50,000,000 (F0498).
Government fees and Zatra's fee
Government charges are paid against the authority's control number at the official rate.
| Register ID | Authority | Item | Amount |
|---|---|---|---|
| F0615 | Mining Commission | PL application; preparation | USD 300; USD 300 |
| F0616 | Mining Commission | PL rent a km2, initial; first renewal; second renewal | USD 100; 150; 200 |
| F0617 | Mining Commission | PL renewal application | USD 300 |
| F0621 | Mining Commission | ML application; preparation; rent a km2 | USD 2,000; USD 1,000; USD 2,000 or 3,000 by group |
| F0628 | Mining Commission | Mineral export permit application | USD 100 |
| F0495 | NEMC | EIA application; project brief or scoping report | TZS 50,000; TZS 150,000 |
| F0498 | NEMC | EIA review, Type A extractive | TZS 5,000,000 to 100,000,000 by project cost |
| F0508 | NEMC | Annual fee, CO2 and helium extraction | TZS 10,000,000 |
Zatra's professional fee for structuring, applications and compliance is quoted separately. It is never folded into these charges or marked up.
What to do now
- Classify the gas. Confirm whether the target is primary helium or helium in natural gas, and check for petroleum blocks over the same ground.
- Fix the mineral group in writing. Ask the Mining Commission which group, rent band, spend line and royalty line it applies to helium.
- Set up the holding structure. Incorporate the Tanzanian company that will hold the licences and receive the Government's shares later.
- File the prospecting licence. Apply on the cadastre portal, pay against the control number and calendar the renewal and relinquishment dates.
- Start the environmental file early. Register with NEMC and scope the assessment to cover seismic, wells and any test production.
- Build the local content plan. Line up Tanzanian suppliers for security, catering and logistics before the drilling contract.
- Model the State's share. Price in the 16% floor, a possible higher negotiated level, royalty, inspection fee and levies.
- Route legal risk to an advocate. A default notice, licence cancellation, seizure, dispute or legal opinion for lenders goes to an advocate.
Key dates
| Date | Event |
|---|---|
| 2017 | Helium One's southern Rukwa prospecting licences PL 11135/2017 and PL 11136/2017 issued |
| 17 September 2024 | Helium One reports its mining licence application; Balangida and eastern Eyasi licences lapse |
| 4 March 2025 | Mining Commission offer of the first helium mining licence reported |
| 31 March 2025 | Offer accepted; first year's fee paid; environmental certificate in place |
| July 2025 | Mining licence awarded to Songwe Helium Ltd |
| 2 May 2026 | Framework and shareholders agreements signed |
| 2 September 2026 | Rift Helium's environmental certificate for Upepo reported |
| 13 November 2026 | Helium One annual results; farm-out talks continue |
| First half of 2027 | Rift Helium drilling planned |
How Zatra helps
Zatra structures the holding company, prepares prospecting and mining licence files for the Mining Commission, and coordinates the NEMC file and the local content plan. We model royalty, levies and the free carried interest for investors and farm-in partners. See our sector business permits service.
Government fees are paid at the official rate against the authority's control number. Zatra's fee is quoted separately. Court or tribunal work, a formal legal opinion, a seizure or a prosecution goes to an advocate, on our team or the client's own. Zatra does not decide or guarantee any authority's outcome.
Sources and status
Accurate as at 19 November 2026.
- Mining Act, Cap. 123, text as at 30 November 2019. TanzLII, 30 November 2019. Accessed 19 Nov 2026.
- Petroleum Act, No. 21 of 2015. Laws.Africa, gazetted text, 2015. Accessed 19 Nov 2026.
- Mining (Mineral Rights) Regulations, GN 1 of 2018. TanzLII, 10 January 2018. Accessed 19 Nov 2026.
- Mining (State Participation) Regulations, GN 574 of 2022. Copy hosted by FB Attorneys, 23 September 2022. Accessed 19 Nov 2026.
- Mining (Local Content) Regulations, GN 3 of 2018. TanzLII, 2018. Accessed 19 Nov 2026.
- Online Mining Cadastre Transactional Portal. Mining Commission, live 2026. Accessed 19 Nov 2026.
- National Environment Management Council. NEMC, live 2026. Accessed 19 Nov 2026.
- Acts administered by PURA. Petroleum Upstream Regulatory Authority, live 2026. Accessed 19 Nov 2026.
- Company update. Helium One Global, RNS, 17 September 2024. Accessed 19 Nov 2026.
- Audited results for the year ended 30 June 2026. Helium One Global via energy-pedia, 13 November 2026. Accessed 19 Nov 2026.
- Investor presentation, April 2026. Noble Helium, ASX release, 2 April 2026. Accessed 19 Nov 2026.
- Noble Helium update report. MST Access, 24 August 2023. Accessed 19 Nov 2026.
- Tanzania enters the global helium market. Rive & Co, 11 May 2026. Accessed 19 Nov 2026.
- TanzaniaInvest reports of 4 March 2025, 16 June 2025, 28 April 2026, 7 May 2026 and 11 August 2026, linked in the text. TanzaniaInvest. Accessed 19 Nov 2026.
- Rift Helium clears key environmental hurdle. Pan African Visions, 2 September 2026. Accessed 19 Nov 2026.
- Tanzania moves to classify helium as a critical and strategic mineral. ChemAnalyst, 22 May 2026. Accessed 19 Nov 2026.
- Here is why Zanzibar is going solo on its oil and gas projects. The Chanzo, 17 August 2022. Accessed 19 Nov 2026.
- Zatra government fee register, lines cited above. Zatra Consultants, fees at 26 September 2026. Accessed 19 Nov 2026.
Figures to confirm before you act
- The royalty line the Commission applies to helium; Zatra reads it as 3% "other minerals".
- The mineral group for helium, which sets PL area, rent, spend and the ML rent band.
- Whether the full 17% at Songwe is free carried, or 16% free carried plus 1% negotiated.
- Which NEMC annual fee line applies to a helium prospecting licence.
- Section numbers in Cap. 123 R.E. 2023 against the Government Printer's copy; we read the 2019 text.
- Whether helium has been gazetted as a critical and strategic mineral.
- Any Zanzibar law on minerals that are not petroleum.
- Government fees from the register at 26 September 2026; the control number governs.
This article is general information based on official sources available at the date of publication. It is not legal, tax or financial advice. Laws and notices change. Verify with the issuing authority or consult Zatra before acting.
Frequently asked questions
Does a petroleum exploration licence let the holder produce helium?
Only helium inside natural gas produced from the contract area, which the Petroleum Act treats as part of that gas. A petroleum holder that wants primary helium outside its hydrocarbon reservoirs needs a mineral right from the Mining Commission. Settle overlapping ground with PURA and the Commission before drilling.
Can a foreign company hold a helium prospecting licence?
Yes. Foreign-owned companies hold helium prospecting licences today through Tanzanian subsidiaries. The mining licence stage needs a Tanzanian company, because the Government takes its free carried shares in the licence-holding company, as Songwe Helium Ltd shows.
Is helium a gemstone or energy mineral for licence purposes?
Neither on the Act's text. Energy minerals are defined as coal, peat, uranium, thorium and other radioactive minerals, and helium is not a gemstone. The Commission decides which regulatory group it uses for area, rent and spend, so get that answer in writing.
How long does a helium prospecting licence last?
Up to four years initially, then two renewals of up to two years each, with partial relinquishment at each renewal. Helium One's southern Rukwa licences dated from 2017 and expired on 1 June 2025, after the mining licence had been applied for.
Does the Government pay for its 17% in Songwe Helium Ltd?
Not for the free carried shares. Under GN 574 of 2022 the Government makes no financial contribution for them, including on later capital increases. Any part of the 17% acquired by negotiation is ordinary equity, and its terms sit in the unpublished framework agreement.
Do helium drill sites need a separate environmental certificate from the production plant?
In practice, yes. Certificates are scoped to the project described. Rift Helium's certificate covers seismic and up to three wells. Production, processing, liquefaction and transport facilities need to be inside the assessed project or covered by a new assessment.
What happens to prospecting licences that are not converted?
They lapse at the end of the final renewal, and the ground returns to the Commission. Helium One let its Balangida and eastern Eyasi licences lapse in 2024 after studies showed low prospectivity. Calendar the expiry dates and file conversions before them.
Sources & regulators
Verify before filing: Rates, forms and thresholds move by Finance Act, Government Notice and portal revision. Confirm the live schedule on the mandate-holder portal before you budget or submit. Law-firm alerts and Big Four notes are discovery only.
- Mining Act, Cap. 123, text as at 30 November 2019: TanzLII, consolidated to 30 November 2019. Accessed 2026-11-19.
- Petroleum Act, No. 21 of 2015: Laws.Africa, gazetted text of Act No. 21 of 2015. Accessed 2026-11-19.
- Mining (Mineral Rights) Regulations, GN 1 of 2018: TanzLII, GN of 10 January 2018. Accessed 2026-11-19.
- Mining (State Participation) Regulations, GN 574 of 2022: Copy hosted by FB Attorneys, GN published 23 September 2022. Accessed 2026-11-19.
- Mining (Local Content) Regulations, GN 3 of 2018: TanzLII, 2018 with amendment list. Accessed 2026-11-19.
- Helium One Global: company update: Helium One Global RNS, 17 September 2024. Accessed 2026-11-19.
- Helium One Global: audited results for the year ended 30 June 2026: Helium One Global via energy-pedia, 13 November 2026. Accessed 2026-11-19.
- Noble Helium investor presentation, April 2026: Noble Helium ASX release, 2 April 2026. Accessed 2026-11-19.
- Noble Helium update report: MST Access, 24 August 2023. Accessed 2026-11-19.
- Tanzania enters the global helium market: legal and commercial analysis of the Southern Rukwa project: Rive & Co, 11 May 2026. Accessed 2026-11-19.
- Tanzania offers first-ever helium mining licence to Helium One: TanzaniaInvest, 4 March 2025. Accessed 2026-11-19.
- Mining licence for Southern Rukwa helium project to be finalised with 17% Government stake: TanzaniaInvest, 16 June 2025. Accessed 2026-11-19.
- Tanzania finalises agreements for first helium mining licence: TanzaniaInvest, 7 May 2026. Accessed 2026-11-19.
- Noble Helium raises AUD 12 million, secures rig for North Rukwa drilling: TanzaniaInvest, 11 August 2026. Accessed 2026-11-19.
- Rift Helium clears key environmental hurdle for Upepo exploration campaign: Pan African Visions, 2 September 2026. Accessed 2026-11-19.
- Tanzania moves to classify helium as a critical and strategic mineral: ChemAnalyst, 22 May 2026. Accessed 2026-11-19.
Disclaimer
This article is informational orientation. It is not legal, tax or investment advice and not a government decision. Tanzanian instruments move by Act, Government Notice, Finance Act and portal revision. If a sentence here disagrees with the live mandate-holder, the mandate-holder wins. Zatra Consultants Limited does not issue licences, permits, tax clearances or approvals, and gives no assurance of any regulatory or banking outcome. Professional fees are published only on /pricing/.